Category Archives: Agenda

Weekly Agenda: January 20-24, 2020

Check here for updated Weekly Agendas to stay current with daily classwork and homework (rare but assigned on occasion), and assignment due dates. The agenda may flex and will be updated during the week on a per need basis. Curriculum overview is HERE.

Period Monday-1.20  Tuesday-1.21 Wednesday-1.22 Thursday-1.23 Friday -1.24
Homeroom

Homeroom Schedule – Cougar Pride Blog

NO SCHOOL:MLK DAY
 
Gender Pronoun Discussion
GPD: Student Handout
Video: Non-conforming gender meet No Homeroom
P. 1 & 4 – Tech Lit

Assignments Link

NO SCHOOL:MLK DAY

 

Mop-up finish all 4 Database Assignments: Earthquakes. Windfall, Temperatures, Oregon Counties

Finish Last Luminaire Print Jobs

 

Intro Photoshop Assignments, Demo Horses Download to files1, demo basic editing and makeover tools, layers, etc.

Horses Makeover Due Tuesday, 1.28

Photoshop Assignment #1: Horses Makeover. Due1.28

Review tools, Q&A, work session

Weekly Update #6

Photoshop Assignment #1: Horses Makeover. Due1.28

Photoshop Assignment #2: Personal Makeover Due 2.4

P. 2 – Broadcast Media

Assignments Link

 

NO SCHOOL:MLK DAY PSA #1 Assignment Work: Peer Review Edits List and Final Cut Due Wednesday, 1.22

Intro Video Angles Assignment – Due 1.30

PSA #1 Assignment Work: Peer Review Edits List and Final Cut Due Wednesday, 1.22

Intro Video Angles Assignment – Due 1.30

Students finished with PSA #1 begin Video Angles Assignment – Due 1.30

Video Angles Assignment – Due 1.30
Begin Studio Training after Midterm
 
Weekly Updates #6

Video Angles Assignment – Due 1.30

Begin Studio Training after Midterm

 

P. 3- Design Technology

Assignments Link

3D Soap Dish Tutorial Link

Luminaire Tutorial Link – Part 1

3D Basket Tutorial

123d Design Tutorial Links 1

 

 

NO SCHOOL:MLK DAY Playgrounds Coding: #6: While Loops – Due 1.24

Playgrounds Coding: #7: Algorithms – Due 1.30

Business Logo/Brand Assignment: Sketches Target Due 1.21

Final Illustrator Design Due 1.22

Personal Logo Assignment – 4 Personal Brand – Final Illustrator Design – PAST DUE 

Playgrounds Coding: #6: While Loops – Due 1.24

Playgrounds Coding: #7: Algorithms – Due 1.30

Target Final Illustrator Design Due 1.22 in Print Queue for printing – extend a day if necessary.

If finished with Business Brand – Do 123d Design Intro with Funnel Tutorial (Print Optional) Due 1.30

 

Playgrounds Coding: #6: While Loops – Due 1.24

Playgrounds Coding: #7: Algorithms – Due 1.30

ALL Students 123d Design Assignment #1: Intro with Funnel Tutorial (Print Optional) Due 1.24

123d Design Assignment #2: A. Luninaire – Printed, Due 1.28 if not done prior, or B. Soap Dish Tutorial – Printed, Due 1.28

Find a 3D Printed example to model – Link on New ePortfolio Page Due 1.30

 

 

Weekly Update#6

Playgrounds Coding: #6: While Loops – Due 1.24

Playgrounds Coding: #7: Algorithms – Due 1.30

ALL Students 123d Design Assignment #1: Intro with Funnel Tutorial (Print Optional) Due 1.24

123d Design Assignment #2: A. Luninaire – Printed, Due 1.28 if not done prior, or B. Soap Dish Tutorial – Printed, Due 1.28

Find a 3D Printed example to model – Link on New ePortfolio Page Due 1.30

P. 6 – J/YB/Pros

Assignments Link

Register Guard eEdition Link

NO SCHOOL:MLK DAY

 

YB Core, Media Pros, ECHO set Week #6 Goals on ePorts – detailed! Goals & Reflections10pts. graded 1.24

Rm. 212 – J/YB: 35mm Shots and Angles Due 1.30

Human Interest Assignment Part A – HI ePortfolio Page Part A 3 HI Samples links w/ abstracts – Due Today, 1.22

Part B: HI 5-3-1, topic, Maps due, Drafts, Peer edits and Final due 1.22

Intro Review Assignment following review formats for Movie, Book, Shows, etc. – Due 1.30

YB Core: Page work, Ads, Portrait pages lists updated, staff lists pages updated

MP REDO Final Cuts 1.22, 2 New Projects start on 1.23: Head Janitor Intro, Day in the Life of a Cougar – Updates List, planning timeline for both projects.

ECHO layout continued work, with extended submission deadline to 2.7

 

YB Core, Media Pros, ECHO set Week #6 Goals on ePorts – detailed! Goals & Reflections10pts. graded 1.24

Rm. 212 – J/YB: 35mm Shots and Angles Due 1.30

Human Interest Assignment Part A – HI ePortfolio Page Part A 3 HI Samples links w/ abstracts – Due Today, 1.22

Part B: HI 5-3-1, topic, Maps due, Drafts, Peer edits and Final due 1.22

Intro Review Assignment following review formats for Movie, Book, Shows, etc. – Due 1.30

YB Core: Page work, Ads, Portrait pages lists updated, staff lists pages updated

MP REDO Final Cuts 1.22

MP REDO Final Cuts 1.22, 2 New Projects start on 1.23: Head Janitor Intro, Day in the Life of a Cougar – Updates List, planning timeline for both projects.

ECHO layout continued work, with extended submission deadline to 2.7

 

YB Core, Media Pros, ECHO set Week #6 Goals on ePorts – detailed! Goals & Reflections10pts. graded 1.24

Rm. 212 – J/YB: 35mm Shots and Angles Due 1.30

Human Interest Assignment Part A – HI ePortfolio Page Part A 3 HI Samples links w/ abstracts – Due Today, 1.22

Part B: HI 5-3-1, topic, Maps due, Drafts, Peer edits and Final due 1.22

Intro Review Assignment following review formats for Movie, Book, Shows, etc. – Due 1.30

YB Core: Page work, Ads, Portrait pages lists updated, staff lists pages updated

MP REDO Final Cuts 1.22

MP REDO Final Cuts 1.22, 2 New Projects start on 1.23: Head Janitor Intro, Day in the Life of a Cougar – Updates List, planning timeline for both projects.

ECHO layout continued work, with extended submission deadline to 2.7

 

 

Weekly Goals Update #6

YB Core, Media Pros, ECHO set Week #6 Goals on ePorts – detailed! Goals & Reflections10pts. graded 1.24

Rm. 212 – J/YB: 35mm Shots and Angles Due 1.30

Human Interest Assignment Part A – HI ePortfolio Page Part A 3 HI Samples links w/ abstracts – Due Today, 1.22

Part B: HI 5-3-1, topic, Maps due, Drafts, Peer edits and Final due 1.22

Intro Review Assignment following review formats for Movie, Book, Shows, etc. – Due 1.30

YB Core: Page work, Ads, Portrait pages lists updated, staff lists pages updated

MP REDO Final Cuts 1.22

MP REDO Final Cuts 1.22, 2 New Projects start on 1.23: Head Janitor Intro, Day in the Life of a Cougar – Updates List, planning timeline for both projects.

ECHO layout continued work, with extended submission deadline to 2.7

Weekly Agenda: January 13-17, 2020

Check here for updated Weekly Agendas to stay current with daily classwork and homework (rare but assigned on occasion), and assignment due dates. The agenda may flex and will be updated during the week on a per need basis. Curriculum overview is HERE.

Period Monday-1.13  Tuesday-1.14 Wednesday-1.15 Thursday-1.16 Friday -1.17
Homeroom

Homeroom Schedule – Cougar Pride Blog

Empathy Presentation
Empathy Article – in Student emailThe Empathy Test
Empathy Discussion   No Homeroom
P. 1 & 4 – Tech Lit

Assignments Link

Finish:Database Assignment #1: Earthquakes Database Assignment Work

Intro Database Assignment #2: $1000 Windfall. Due Wednesday 1.15

Continue printing completed, approved, and .stl saved files.

 

Database Assignment #2: $1000 Windfall. Due Wednesday 1.15

Intro Database Assignments #3 & #4: Eugene Temps, Oregon Counties – Target Due Friday 1.17

Continue printing completed, approved, and .stl saved files.

 

Database Assignment #2: $1000 Windfall. Due Wednesday 1.15

Database Assignments #3 & #4: Eugene Temps, Oregon Counties – Target Due Friday 1.17

Continue printing completed, approved, and .stl saved files.

Database Assignments #3 & #4: Eugene Temps, Oregon Counties – Target Due Friday 1.17

Continue printing completed, approved, and .stl saved files.

Weekly Update #5

Database Assignments #3 & #4: Eugene Temps, Oregon Counties – Target Due Friday 1.17

Continue printing completed, approved, and .stl saved files.

 

P. 2 – Broadcast Media

Assignments Link

 

PSA #1 Assignment Work:

Rough Cut Due 1.15 – on Vimeo Streamed to ePortfolio for Peer Review

Peer Review Edits List Due 1.17

Final Cut Due 1.22

PSA #1 Assignment Work:

Rough Cut Due 1.15 – on Vimeo Streamed to ePortfolio for Peer Review

Peer Review Edits List Due 1.17

Final Cut Due 1.22

PSA #1 Assignment Work:

Rough Cut Due 1.15 – on Vimeo Streamed to ePortfolio for Peer Review

Peer Review Edits List Due 1.17

Final Cut Due 1.22

PSA #1 Assignment Work:

Rough Cut Due 1.15 – on Vimeo Streamed to ePortfolio for Peer Review

Peer Review Edits List Due 1.17

Final Cut Due 1.22

Weekly Updates #5

PSA #1 Assignment Work:

Rough Cut Due 1.15 – on Vimeo Streamed to ePortfolio for Peer Review

Peer Review Edits List Due 1.17

Final Cut Due 1.22

P. 3- Design Technology

Assignments Link

 

Playgrounds Coding: Conditional Code – PAST DUE – CW and HW (Classwork as other assignments get finished, otherwise homework)

Playgrounds Coding: #5: LOGICAL OPERATORS – Due 1.17

Personal Logo Assignment – 4 Personal Brand – Final Illustrator Design Due for Printing Extended Due 1.14… Printing as in the queue.

Business Logo/Brand Assignment: Sketches Target Due 1.16

Final Illustrator Design Due 1.22

Playgrounds Coding: #5: LOGICAL OPERATORS – Due 1.17

Personal Logo Assignment – 4 Personal Brand – Final Illustrator Design Due for Printing Extended Due 1.14… Printing as in the queue.

Business Logo/Brand Assignment: Sketches Target Due 1.16

Final Illustrator Design Due 1.22

 

Playgrounds Coding: #5: LOGICAL OPERATORS – Due 1.17

Personal Logo Assignment – 4 Personal Brand – Final Illustrator Design Due for Printing Extended Due 1.14… Printing as in the queue.

Business Logo/Brand Assignment: Sketches Target Due 1.16

Final Illustrator Design Due 1.22

 

Playgrounds Coding: #5: LOGICAL OPERATORS – Due 1.17

Personal Logo Assignment – 4 Personal Brand – Final Illustrator Design Due for Printing Extended Due 1.14… Printing as in the queue.

Business Logo/Brand Assignment: Sketches Target Due 1.16

Final Illustrator Design Due 1.22

 

Weekly Update#5

Playgrounds Coding: #5: LOGICAL OPERATORS – Due 1.17

Personal Logo Assignment – 4 Personal Brand – Final Illustrator Design Due for Printing Extended Due 1.14… Printing as in the queue.

Business Logo/Brand Assignment: Sketches Target Due 1.16

Final Illustrator Design Due 1.22

P. 6 – J/YB/Pros

Assignments Link

Register Guard eEdition Link

YB Core, Media Pros, ECHO set Week #5 Goals on ePorts – detailed! Goals & Reflections10pts. graded 1.17

Rm. 212 – J/YB: 35mm Shots and Angles Due before Midterms

Human Interest Assignment Part A – HI ePortfolio Page Part A 3 HI Samples links w/ abstracts – Due Today, 1.13

Part B: HI 5-3-1, topic Due 1.13, Maps due 1.14, Drafts Due 1.16, peer edits and final due 1.22

YB Core: Page work, Ads, Portrait pages lists updated, staff lists pages updated

MP REDO rough cuts due 1.17

ECHO layout feedback and needs Due 1.14, PSA for content Due by 1.17 – extend submission deadline to 2.7

 

YB Core, Media Pros, ECHO set Week #5 Goals on ePorts – detailed! Goals & Reflections10pts. graded 1.17

Rm. 212 – J/YB: 35mm Shots and Angles Due before Midterms

Human Interest Assignment Part A – HI ePortfolio Page Part A 3 HI Samples links w/ abstracts – Due Today, 1.13

Part B: HI 5-3-1, topic Due 1.13, Maps due 1.14, Drafts Due 1.16, peer edits and final due 1.22

YB Core: Page work, Ads, Portrait pages lists updated, staff lists pages updated

MP REDO rough cuts due 1.17

ECHO layout feedback and needs Due 1.14, PSA for content Due by 1.17 – extend submission deadline to 2.7

 

YB Core, Media Pros, ECHO set Week #5 Goals on ePorts – detailed! Goals & Reflections10pts. graded 1.17

Rm. 212 – J/YB: 35mm Shots and Angles Due before Midterms

Human Interest Assignment Part A – HI ePortfolio Page Part A 3 HI Samples links w/ abstracts – Due Today, 1.13

Part B: HI 5-3-1, topic Due 1.13, Maps due 1.14, Drafts Due 1.16, peer edits and final due 1.22

YB Core: Page work, Ads, Portrait pages lists updated, staff lists pages updated

MP REDO rough cuts due 1.17

ECHO layout feedback and needs Due 1.14, PSA for content Due by 1.17 – extend submission deadline to 2.7

 

YB Core, Media Pros, ECHO set Week #5 Goals on ePorts – detailed! Goals & Reflections10pts. graded 1.17

Rm. 212 – J/YB: 35mm Shots and Angles Due before Midterms

Human Interest Assignment Part A – HI ePortfolio Page Part A 3 HI Samples links w/ abstracts – Due Today, 1.13

Part B: HI 5-3-1, topic Due 1.13, Maps due 1.14, Drafts Due 1.16, peer edits and final due 1.22

YB Core: Page work, Ads, Portrait pages lists updated, staff lists pages updated

MP REDO rough cuts due 1.17

ECHO layout feedback and needs Due 1.14, PSA for content Due by 1.17 – extend submission deadline to 2.7

 

Weekly Goals Update #5

YB Core, Media Pros, ECHO set Week #5 Goals on ePorts – detailed! Goals & Reflections10pts. graded 1.17

Rm. 212 – J/YB: 35mm Shots and Angles Due before Midterms

Human Interest Assignment Part A – HI ePortfolio Page Part A 3 HI Samples links w/ abstracts – Due Today, 1.13

Part B: HI 5-3-1, topic Due 1.13, Maps due 1.14, Drafts Due 1.16, peer edits and final due 1.22

YB Core: Page work, Ads, Portrait pages lists updated, staff lists pages updated

MP REDO rough cuts due 1.17

ECHO layout feedback and needs Due 1.14, PSA for content Due by 1.17 – extend submission deadline to 2.7

 

Weekly Agenda: January 6-10, 2019

Check here for updated Weekly Agendas to stay current with daily classwork and homework (rare but assigned on occasion), and assignment due dates. The agenda may flex and will be updated during the week on a per need basis. Curriculum overview is HERE.

Period Monday-1.06  Tuesday-1.07 Wednesday-1.08 Thursday-1.09 Friday -1.10
Homeroom

Homeroom Schedule – Cougar Pride Blog

Teacher PD – No School
Review School- Wide Expectations Teacher Choice
No Homeroom
P. 1 & 4 – Tech Lit

Assignments Link

Teacher PD – No School

 

Luminaire Tutorial Link

Luminaire Work: Selecting, prepping, and subtracting line art from shells. Target 1.8 for completion.

Continue printing completed, approved, and .stl saved files.

Extra Credit: Create a second luminaire design.

Luminaire Tutorial Link

Luminaire Work: Selecting, prepping, and subtracting line art from shells. Target 1.8 for completion.

Continue printing completed, approved, and .stl saved files.

Extra Credit: Create a second luminaire design.

Introduce Databases: Concepts, and examples, Google Sheets and Google Docs set-up for 4 DB Assignments.
Assignment #1: Earthquakes DB – Due 1.14
Weekly Update #4

Database Assignment #1: Earthquakes Database Assignment Work

P. 2 – Broadcast Media

Assignments Link

 

Teacher PD – No School PSA #1 Assignment Work: 5-3-1 Topic Approved PAST DUE

Elevator Speech Extended Due 1.7 – Samples available

Script Due 1.9 – Samples available

Rough Cut Due 1.15 – on Vimeo Streamed to ePortfolio for Peer Review

Peer Review Edits List Due 1.17

Final Cut Due 1.22

PSA #1 Assignment Work: 5-3-1 Topic Approved PAST DUE

Elevator Speech Extended Due 1.7 – Samples available

Script Due 1.9 – Samples available

Rough Cut Due 1.15 – on Vimeo Streamed to ePortfolio for Peer Review

Peer Review Edits List Due 1.17

Final Cut Due 1.22

PSA #1 Assignment Work: 5-3-1 Topic Approved PAST DUE

Elevator Speech Extended Due 1.7 – Samples available

Script Due 1.9 – Samples available

Rough Cut Due 1.15 – on Vimeo Streamed to ePortfolio for Peer Review

Peer Review Edits List Due 1.17

Final Cut Due 1.22

Weekly Updates #4

PSA #1 Assignment Work: 5-3-1 Topic Approved PAST DUE

Elevator Speech Extended Due 1.7 – Samples available

Script Due 1.9 – Samples available

Rough Cut Due 1.15 – on Vimeo Streamed to ePortfolio for Peer Review

Peer Review Edits List Due 1.17

Final Cut Due 1.22

P. 3- Design Technology

Assignments Link

 

Teacher PD – No School Playgrounds Coding: Loops PAST DUE

Playgrounds Coding: Conditional Code – Due 1.10 CW and HW (Classwork as other assignments get finished, otherwise homework)

Personal Logo Assignment – 4 Personal Themed Sketches Due-1.8 for feedback and selection for #1 Design to create in Illustrator

Intro Adobe Illustrator tools: Text tools, paths, outlines, how to use web line art for designs.

Illustrator Drafts TARGET DUE – 1.10

 

Playgrounds Coding: Conditional Code – Due 1.10 CW and HW (Classwork as other assignments get finished, otherwise homework)

Personal Logo Assignment – 4 Personal Themed Sketches Due-1.8 for feedback and selection for #1 Design to create in Illustrator

Intro Adobe Illustrator tools: Text tools, paths, outlines, how to use web line art for designs.

Illustrator Drafts TARGET DUE – 1.10

 

Playgrounds Coding: Conditional Code – Due 1.10 CW and HW (Classwork as other assignments get finished, otherwise homework)

Personal Logo Assignment – 4 Personal Themed Sketches Due-1.8 for feedback and selection for #1 Design to create in Illustrator

Intro Adobe Illustrator tools: Text tools, paths, outlines, how to use web line art for designs.

Illustrator Drafts TARGET DUE – 1.10

Weekly Update#4

Playgrounds Coding: Conditional Code – Due 1.10 CW and HW (Classwork as other assignments get finished, otherwise homework)

Personal Logo Assignment – 4 Personal Themed Sketches Due-1.8 for feedback and selection for #1 Design to create in Illustrator

Intro Adobe Illustrator tools: Text tools, paths, outlines, how to use web line art for designs.

Illustrator Drafts TARGET DUE – 1.10

P. 6 – J/YB/Pros

Assignments Link

Register Guard eEdition Link

Teacher PD – No School Rm. 212J/YB: 35mm Shots and Angles Assignment – if finished with  Editorial Assignment
Editorial Assignment links and topics on Schiff Blog – Idea Map and Draft Due Extended to 1.7, Peer edited Final Copy/Packet Due 1.9

Human Interest Assignment Intro – Example Links on HI ePortfolio Page with 5-3-1 Topic Due 1.10

YB Core: Weekly goals – relating to YB work!, Check in with leads, Zinger work, Middle Middle, help students in Rm. 212, homework. 3 Week Project Work Assessment Due 1.7 – See grades! 

Clean-up ePortfolios – check on 1.10

ECHO:  Goals setting for week. Continue to work on ECHO production and/or HW – 3 Week Self Assessment – on new ePortfolio page Due 1.7

Clean-up ePortfolios – check on 1.10

Media Pros: PSA #3 – Schiff Feedback on Project work. Clean up PSAs – Redos Due 1.10,

Clean-up ePortfolios – check on 1.10

Due Today – 3 Week Self Assessment – on new ePortfolio page Due 1.7

Rm. 212 – J/YB:     35mm Shots and Angles Assignment – if finished with  Editorial Assignment
Editorial Assignment: Peer edited Final Copy/Packet Due 1.9

Human Interest Assignment Intro – Example Links on HI ePortfolio Page with 5-3-1 Topic Due 1.10

YB CoreWeekly goals – relating to YB work!, Check in with leads, Zinger work, Middle Middle, help students in Rm. 212, homework. 3 Week Project Work Assessment Due 1.7 – See grades! 

Clean-up ePortfolios – check on 1.10

ECHO:  Goals setting for week. Continue to work on ECHO production and/or HW – 3 Week Self Assessment – on new ePortfolio page Due 1.7

Clean-up ePortfolios – check on 1.10

Media Pros:   PSA #3 – Schiff Feedback on Project work. Clean up PSAs – Redos Due 1.10,

Clean-up ePortfolios – check on 1.10

Due Today – 3 Week Self Assessment – on new ePortfolio page Due 1.7

 

Rm. 212 – J/YB:     35mm Shots and Angles Assignment – if finished with  Editorial Assignment
Editorial Assignment: Peer edited Final Copy/Packet Due 1.9

Human Interest Assignment Intro – Example Links on HI ePortfolio Page with 5-3-1 Topic Due 1.10

YB CoreWeekly goals – relating to YB work!, Check in with leads, Zinger work, Middle Middle, help students in Rm. 212, homework. 3 Week Project Work Assessment Due 1.7 – See grades! 

Clean-up ePortfolios – check on 1.10

ECHO:  Goals setting for week. Continue to work on ECHO production and/or HW – 3 Week Self Assessment – on new ePortfolio page Due 1.7

Clean-up ePortfolios – check on 1.10

Media Pros:   PSA #3 – Schiff Feedback on Project work. Clean up PSAs – Redos Due 1.10,

Clean-up ePortfolios – check on 1.10

Due Today – 3 Week Self Assessment – on new ePortfolio page Due 1.7

Weekly Goals Update #4

Rm. 212 – J/YB:     35mm Shots and Angles Assignment – if finished with  Editorial Assignment

Editorial Assignment: Peer edited Final Copy/Packet PAST DUE

Human Interest Assignment Intro – Example Links on HI ePortfolio Page with 5-3-1 Topic Due 1.10

YB CoreWeekly goals – relating to YB work!, Check in with leads, Zinger work, Middle Middle, help students in Rm. 212, homework. 3 Week Project Work Assessment Due 1.7 – See grades! 

Clean-up ePortfolios – check on 1.10

ECHO:  Goals setting for week. Continue to work on ECHO production and/or HW – 3 Week Self Assessment – on new ePortfolio page Due 1.7

Clean-up ePortfolios – check on 1.10

Media Pros:   PSA #3 – Schiff Feedback on Project work. Clean up PSAs – Redos Due 1.10,

Clean-up ePortfolios – check on 1.10

Due Today – 3 Week Self Assessment – on new ePortfolio page Due 1.7

 

Weekly Agenda: December 16-20, 2019

Check here for updated Weekly Agendas to stay current with daily classwork and homework (rare but assigned on occasion), and assignment due dates. The agenda may flex and will be updated during the week on a per need basis. Curriculum overview is HERE.

Period Monday – 12.16  Tuesday -12.17 Wednesday -12.18 Thursday -12.19 Friday -12.20
Homeroom

Homeroom Schedule – Cougar Pride Blog

Review Field Trip Expectations

All School Field Trip to UO Women’s BB Game – Board buses at 9:25AM – Return for shortened 5th and 6th periods.

Debrief BB Game Field Trip

Cyber Crime Assembly Expectations

Cyber Crimes Assembly  – Friday Schedule

Teacher Choice
No Homeroom
P. 1 & 4 – Tech Lit

Assignments Link

All School Field Trip to UO Women’s BB Game – Board buses at 9:25AM – Return for shortened 5th and 6th periods.

 

Intro to 3D Luminaire Assignment – Begin Tutorial

Luminaire Tutorial Link

Target “Luminaire Shell” completion for 12.17 – 12.18

Make 2 Luminaire Shells – name them Luminaire 1, Luminaire 2 – save in files1.

Luminaire Assignment Work.

Target “Luminaire Shell” completion for 12.17 – 12.18

Intro how to select line art for Luminaire Shell design

Intro to 3D Luminaire Assignment – Begin Tutorial

Target “Luminaire Shell” completion for 12.17 – 12.18

Selecting, prepping, and subtracting line art from shells. Target 12.20 for completion

Weekly Update #2

Early Release

Selecting, prepping, and subtracting line art from shells. Target 12.20 for completion

P. 2 – Broadcast Media

Assignments Link

 

All School Field Trip to UO Women’s BB Game – Board buses at 9:25AM – Return for shortened 5th and 6th periods. 10 PSA Assignment – show format examples, requirements.

Show PSA Topics list/link, discuss topic – Target Due: 12.17

Show examples of PSA #1

Intro PSA #1 Assignment, brainstorm short list of topics. 5-3-1 Topic choice on ePortfolio PSA #1 Page – Due 12.19

Elevator Speech Target Due 12.20

PSA #1 Assignment, brainstorm short list of topics. 5-3-1 Topic choice on ePortfolio PSA #1 Page – Due 12.19

Elevator Speech Target Due 12.20

Weekly Updates #3

Short Classes

PSA #1 Assignment, brainstorm short list of topics. 5-3-1 Topic choice on ePortfolio PSA #1 Page – Due 12.19

Elevator Speech Target Due 12.20

P. 3- Design Technology

Assignments Link

 

All School Field Trip to UO Women’s BB Game – Board buses at 9:25AM – Return for shortened 5th and 6th periods. Playgrounds Coding: Functions PAST DUE

Playgrounds Coding: Loops – Due 12.20 CW and HW (Classwork as other assignments get finished, otherwise homework)

Brand Awareness Assignments Part A & B PAST DUE

 

Playgrounds Coding: Loops – Due 12.20 CW and HW (Classwork as other assignments get finished, otherwise homework)

Intro Personal Logo Assignment – 4 Persoanl Themed Sketches Due after Break

 

Playgrounds Coding: Loops – Due 12.20 CW and HW (Classwork as other assignments get finished, otherwise homework)

Intro Personal Logo Assignment – 4 Persoanl Themed Sketches Due after Break

 

Weekly Update#3

Playgrounds Coding: Loops – Due 12.20 CW and HW (Classwork as other assignments get finished, otherwise homework)

Intro Personal Logo Assignment – 4 Persoanl Themed Sketches Due after Break

 

P. 6 – J/YB/Pros

Assignments Link

Register Guard eEdition Link

Rm. 212 – J/YB 35mm Shots and Angles Assignment – Editorial Assignment has priority
Editorial Assignment links and topics on Schiff Blog – Org Map and Draft Due Drafts due 12.20YB Core – Weekly goals, check in with leads, Zinger work, help students in Rm. 212, homework.ECHO – Goals setting for week. Continue to work on ECHO production and/or HW

Media Pros – PSA #3 – production work in teams, target for complete peer reviewed PSAs – Mop up Review with Schiff on Tuesday 12.17.

 

Rm. 212 – J/YB 35mm Shots and Angles Assignment – Editorial Assignment has priority
Editorial Assignment links and topics on Schiff Blog – Org Map and Draft Due Drafts due 12.20YB Core – Weekly goals, check in with leads, Zinger work, help students in Rm. 212, homework.ECHO – Goals setting for week. Continue to work on ECHO production and/or HW

Media Pros – PSA #3 – production work in teams, target for complete peer reviewed PSAs – Mop up Review with Schiff on Tuesday 12.17.

 

 

 

Rm. 212 – J/YB 35mm Shots and Angles Assignment – Editorial Assignment has priority
Editorial Assignment links and topics on Schiff Blog – Org Map and Draft Due Drafts due 12.20YB Core – Weekly goals, check in with leads, Zinger work, help students in Rm. 212, homework. – 3 Week Self Assessment – on new ePortfolio page Due 12.20ECHO – Goals setting for week. Continue to work on ECHO production and/or HW – 3 Week Self Assessment – on new ePortfolio page Due 12.20

Media Pros – PSA #3 – Schiff edits Due 12.20 – 3 Week Self Assessment – on new ePortfolio page Due 12.20

Rm. 212 – J/YB 35mm Shots and Angles Assignment – Editorial Assignment has priority
Editorial Assignment links and topics on Schiff Blog – Org Map and Draft Due Drafts due 12.20YB Core – Weekly goals, check in with leads, Zinger work, help students in Rm. 212, homework. – 3 Week Self Assessment – on new ePortfolio page Due 12.20ECHO – Goals setting for week. Continue to work on ECHO production and/or HW – 3 Week Self Assessment – on new ePortfolio page Due 12.20

Media Pros – PSA #3 – Schiff edits  Due 12.20 – 3 Week Self Assessment – on new ePortfolio page Due 12.20

Weekly Goals Update #3

Rm. 212 – J/YB 35mm Shots and Angles Assignment – Editorial Assignment has priority

Editorial Assignment links and topics on Schiff Blog – Org Map and Draft Due Drafts due 12.20

YB Core – Weekly goals, check in with leads, Zinger work, help students in Rm. 212, homework. – 3 Week Self Assessment – on new ePortfolio page Due 12.20

ECHO – Goals setting for week. Continue to work on ECHO production and/or HW – 3 Week Self Assessment – on new ePortfolio page

Media Pros – PSA #3 – Schiff Edits Due Today – 3 Week Self Assessment – on new ePortfolio page Due 12.20

Weekly Agenda: December 9-13, 2019

Check here for updated Weekly Agendas to stay current with daily classwork and homework (rare but assigned on occasion), and assignment due dates. The agenda may flex and will be updated during the week on a per need basis. Curriculum overview is HERE.

Period Monday – 12.09  Tuesday -12.10 Wednesday -12.11 Thursday -12.12 Friday -12.13
Homeroom

Homeroom Schedule – Cougar Pride Blog

Diversity Focus:Gender Identity, Expression and Sexual Orientation: Slides 1-14 (con’t on Tuesday)

Gingerbread Lesson emailed to Students

 

Diversity Focus:Gender Identity, Expression and Sexual Orientation: Slides 15-16

Demystifying Coming Out Lesson  Handout emailed to Students

UO Basketball Field Trip Expectations No Homeroom
P. 1 & 4 – Tech Lit

Assignments Link

Intro to Research Paper & Bibliography Assignment – Link to Google Doc “Hybrid Cars Report” Here

Link to Google Doc “Hybrid Cars Bibliography” Here

Both Due Wednesday, 12.11

Mop-up ePortfolio Set-up.

If finished with assignmments: Extra Credit Opportunities – screen shot and record ones completed with review on “Extra Credit” ePortfolio page under Tech Lit

Research Paper & Bibliography Assignment – Link to Google Doc “Hybrid Cars Report” Here

Link to Google Doc “Hybrid Cars Bibliography” Here

Both Due Wednesday, 12.11

Mop-up ePortfolio Set-up.

If finished with assignmments: Extra Credit Opportunities – screen shot and record ones completed with review on “Extra Credit” ePortfolio page under Tech Lit

Research Paper & Bibliography Assignment – Link to Google Doc “Hybrid Cars Report” Here

Link to Google Doc “Hybrid Cars Bibliography” Here

Both Due Wednesday, 12.11

Intro to 3D Luminaire Assignment – Begin Tutorial

Target “Luminaire Shell” completion for 12.13 – 12.16

Weekly Update #1

Early Release

3D Luminaire Assignment work.

Show patterns search for line art.

Target “Luminaire Shell” completion for 12.13 – 12.16

P. 2 – Broadcast Media

Assignments Link

 

5 PSA Assessment – Past Due.
Climate Change PSA (3) Assignment work.Target Due: 12.11
Climate Change PSA (3) Assignment work.

Target Due: 12.11

Intro 10 PSA Assignment – show format examples, requirements.

Show PSA Topics list/link, discuss topics

Target Due: 12.17

Climate Change PSA (3) Assignment work.

Target Due: 12.11

Intro 10 PSA Assignment – show format examples, requirements.

Show PSA Topics list/link, discuss topics

Target Due: 12.17

Climate Change PSA (3) Assignment work.

Target Due: 12.11

Intro 10 PSA Assignment – show format examples, requirements.

Show PSA Topics list/link, discuss topics

Target Due: 12.17

Weekly Updates #2

Short Classes

Climate Change PSA (3) Assignment work.

Target Due: 12.11

Intro 10 PSA Assignment – show format examples, requirements.

Show PSA Topics list/link, discuss topics

Target Due: 12.17

P. 3- Design Technology

Assignments Link

 

Playgrounds Coding: Functions Lessons Due 12.13 – CW and HW (Classwork as other assignments get finished, otherwise homework)
Playgrounds Coding: Commands Past DueBrand Awareness Assignment Due 12.11 – if finished, CODE! And, work ahead to the next set of lessons is OK!
Playgrounds Coding: Functions Lessons Due 12.13 – CW and HW (Classwork as other assignments get finished, otherwise homework)

Brand Awareness Assignment Due 12.11 – if finished, CODE! And, work ahead to the next set of lessons is OK!

Introduce Brand Awareness Assignment Part B (5 Brands Brief) – Due 12.13

Playgrounds Coding: Functions Lessons Due 12.13 – CW and HW (Classwork as other assignments get finished, otherwise homework)

Brand Awareness Assignment Due 12.11 – if finished, CODE! And, work ahead to the next set of lessons is OK!

Brand Awareness Assignment Part B (5 Brands Brief) – Due 12.13

Playgrounds Coding: Functions Lessons Due 12.13 – CW and HW (Classwork as other assignments get finished, otherwise homework)

Brand Awareness Assignment PAST DUE

Brand Awareness Assignment Part B (5 Brands Brief) – Due 12.13

Weekly Update#2

Playgrounds Coding: Functions Lessons Due 12.13 – CW and HW (Classwork as other assignments get finished, otherwise homework)

Brand Awareness Assignment PAST DUE

Brand Awareness Assignment Part B (5 Brands Brief) – Due 12.13

P. 6 – J/YB/Pros

Assignments Link

Register Guard eEdition Link

Rm. 212 – J/YB Students: Intro to Pics for YB – Shots and Angles Assignment – Due 12.10

If finished, self intro to Editorial Assignment links and topics on Schiff Blog – topics are due Wednesday, 12.11, Drafts due 12.20

YB Core – Weekly goals, check in with leads, Zinger work, help students in Rm. 212, homework.

ECHO – Goals setting for week. Continue to work on ECHO production and/or HW

Media Pros – PSA #3 – production work in teams, target for complete peer reviewed PSAs 12.11, show to Schiff on Thursday, 12-12

 

Rm. 212 – J/YB Students: Intro to Pics for YB – Shots and Angles Assignment – Due 12.10

If finished, self intro to Editorial Assignment links and topics on Schiff Blog – topics are due Wednesday, 12.11, Drafts due 12.20

YB Core – Weekly goals, check in with leads, Zinger work, help students in Rm. 212, homework.

ECHO – Goals setting for week. Continue to work on ECHO production and/or HW

Media Pros – PSA #3 – production work in teams, target for complete peer reviewed PSAs 12.11, show to Schiff on Thursday, 12-12

 

 

 

Rm. 212 – J/YB Students: Intro to Pics for YB – Shots and Angles Assignment – Due 12.10

If finished, self intro to Editorial Assignment links and topics on Schiff Blog – topics are due Wednesday, 12.11, Drafts due 12.20

YB Core – Weekly goals, check in with leads, Zinger work, help students in Rm. 212, homework.

ECHO – Goals setting for week. Continue to work on ECHO production and/or HW

Media Pros – PSA #3 – production work in teams, target for complete peer reviewed PSAs 12.11, show to Schiff on Thursday, 12-12

 

Rm. 212 – J/YB Students: Intro to Pics for YB – Shots and Angles Assignment – Due 12.10

If finished, self intro to Editorial Assignment links and topics on Schiff Blog – topics are due Wednesday, 12.11, Drafts due 12.20

YB Core – Weekly goals, check in with leads, Zinger work, help students in Rm. 212, homework.

ECHO – Goals setting for week. Continue to work on ECHO production and/or HW

Media Pros – PSA #3 – production work in teams, target for complete peer reviewed PSAs 12.11, show to Schiff on Thursday, 12-12

Weekly Goals Update #2

Rm. 212 – J/YB Students: Intro to Pics for YB – Shots and Angles Assignment – Due 12.10

If finished, self intro to Editorial Assignment links and topics on Schiff Blog – topics are due Wednesday, 12.11, Drafts due 12.20

YB Core – Weekly goals, check in with leads, Zinger work, help students in Rm. 212, homework.

ECHO – Goals setting for week. Continue to work on ECHO production and/or HW

Media Pros – PSA #3 – production work in teams, target for complete peer reviewed PSAs 12.11, show to Schiff on Thursday, 12-12

Weekly Agenda: December 2-6, 2019

Check here for updated Weekly Agendas to stay current with daily classwork and homework (rare but assigned on occasion), and assignment due dates. The agenda may flex and will be updated during the week on a per need basis. Curriculum overview is HERE.

Period Monday – 12.02  Tuesday -12.03 Wednesday -12.04 Thursday -12.05 Friday -12.06
Homeroom

Homeroom Schedule – Cougar Pride Blog

No School
Hand-out Basketball Field Trip Forms review: Due 12.11
Growth Mindset Presentation
Growth Mindset Presentation No Homeroom
P. 1 & 4 – Tech Lit

Assignments Link

No School Intro to Class
Expectations, Files 1 set-up, ePortfolio expectations and set-up
Files 1 set-up, ePortfolio expectations and set-up Files 1 set-up, ePortfolio expectations and set-up

Learn about extra credit opportunities

Weekly Update #1

Early Release

Mop-up ePortfolio Set-up.

Extra Credit Opportunities – log ones completed with review on ePortfolio page.

For next week – Monday: Intro to Report formatting in Google Docs

P. 2 – Broadcast Media

Assignments Link

 

No School
Intro to class

Expectations

ePortfolio set-up: Front load all assignment pages, in order, complete with descriptions.

Complete ePortfolio Set-up,

Files 1 tune-up with new directories

Intro PSA concepts: what, design, production, value

PSA Exercises #1 & #2

Finish PSA Exercises #1 & #2

Introduce PSA Rubric for Effective and High Quality PSAs – Do Climate Change PSA exercise

 

 

Assignment #1 – 5 PSA Exercise. Copy and Paste template to page in ePortfolio and begin evaluating 5 PSAs.
Due 12.09 
Weekly Updates #1

Short Classes

Assignment #1 – 5 PSA Exercise. Copy and Pste template to page in ePortfolio and Finish evaluating 5 PSAs
Due 12.09

P. 3- Design Technology

Assignments Link

 

Complete ePortfolio Set-up,

Files 1 tune-up with new directories

Intro PSA concepts: what, design, production, value

PSA Exercises #1 & #2

Intro to class

Expectations

ePortfolio set-up: Front load all assignment pages, in order, complete with descriptions.

 

Finish PSA Exercises #1 & #2

Introduce PSA Rubric for Effective and High Quality PSAs – Do Climate Change PSA exercise

Intro Brands and Logos.Show Diigo links to logos
Basic Design concepts. Famous brands
Intro Brand awareness Assignment.Finish ePortfolio Set-up for all assignments.Files 1 tune-up with new directories

If time and done with ePortfolio set-up begin Assignment #1 – Brand Awareness – Due 12.09

5 Brand Sample Assignment Due Monday, 12.09

Intro Brand Awareness assignment #2

 

Weekly Update#1

Short Classes

5 Brand Sample Assignment Due Monday, 12.09 on ePortfolios

 

P. 6 – J/YB/Pros

Assignments Link

Register Guard eEdition Link

No School Begin ePortfoliio Set-up for all assignments.

Files 1 tune-up with new directories

YB Core – ePortfolio Set-up. Finish job setting. Begin Weekly goals.

ECHO – Goals setting for week. Set timeline for 1st ECHO. Begin Design ideas for magazine format.

Media Pros – Timeline for PSA #3 – 3 teams, all 3 topics. Research 3 different PSAs on each topic – Links due on ePortfolios 12.09

ECHO – Goals setting for week. Set timeline for 1st ECHO. Begin Design ideas for magazine format.

 

Rm. 212 – J/YB Students: Intro to Pics for YB – Shots and Angles Assignment – Due 12.10

Begin ePortfoliio Set-up for all assignments.

Files 1 tune-up with new directories

YB Core – ePortfolio Set-up. Finish job setting. Begin Weekly goals.

ECHO – Goals setting for week. Set timeline for 1st ECHO. Begin Design ideas for magazine format.

Media Pros – Timeline for PSA #3 – 3 teams, all 3 topics. Research 3 different PSAs on each topic – Links due on ePortfolios 12.09

ECHO – Goals setting for week. Set timeline for 1st ECHO. Begin Design ideas for magazine format.

Rm. 212 – J/YB Students: Intro to Pics for YB – Shots and Angles Assignment – Due 12.10

Begin ePortfoliio Set-up for all assignments.

Files 1 tune-up with new directories

YB Core – ePortfolio Set-up. Finish job setting. Begin Weekly goals.

ECHO – Goals setting for week. Set timeline for 1st ECHO. Begin Design ideas for magazine format.

Media Pros – Timeline for PSA #3 – 3 teams, all 3 topics. Research 3 different PSAs on each topic – Links due on ePortfolios 12.09

Weekly Goals Update #1

Rm. 212 – J/YB Students: Intro to Pics for YB – Shots and Angles Assignment – Due 12.10

Begin ePortfoliio Set-up for all assignments.

Files 1 tune-up with new directories

YB Core – ePortfolio Set-up. Finish job setting. Begin Weekly goals.

ECHO – Goals setting for week. Set timeline for 1st ECHO. Begin Design ideas for magazine format.

Media Pros – Timeline for PSA #3 – 3 teams, all 3 topics. Research 3 different PSAs on each topic – Links due on ePortfolios 12.09

ECHO – Goals setting for week. Set timeline for 1st ECHO. Begin Design ideas for magazine format.

Weekly Agenda: November 25-27, 2019

Check here for updated Weekly Agendas to stay current with daily classwork and homework (rare but assigned on occasion), and assignment due dates. The agenda may flex and will be updated during the week on a per need basis. Curriculum overview is HERE.

Period Monday-11.18  Tuesday -11.19 Wednesday-11.20 Thursday -11.21 Friday -11.22
Homeroom

Homeroom Schedule – Cougar Pride Blog

Climate Survey

School Climate and Culture Continued

Check Student Email for Survey

 

Climate Survey

School Climate and Culture Continued

 No HR Holiday Holiday
P. 1 & 4 – Tech Lit

Assignments Link

Extra Credit Fun Links (with permission when assignments completed ahead)

iBook Past Due

Choice Project Date 11.26

Any Extra Credit Due 11.26

iBook Past Due

Choice Project Date 11.26

Any Extra Credit Due 11.26

Weekly Update #8/9

 

Holiday Holiday
P. 2 – Design Technology

Assignments Link

 

Teams begin Bot Battles

ePortfolio “1 Stop” page with all Robotics work shown. Must include: Description of Project, reflection on individual work, reflection/evaluation of team work, pictures of basic build, customized build and video of Bot Battles streamed from Vimeo. Due 11.27

Example HERE

 

Bot Battles

ePortfolio “1 Stop” page with all Robotics work shown. Must include: Description of Project, reflection on individual work, reflection/evaluation of team work, pictures of basic build, customized build and video of Bot Battles streamed from Vimeo. Due 11.27

Example HERE

Weekly Update #12

Bot Battles

ePortfolio “1 Stop” page with all Robotics work shown. Must include: Description of Project, reflection on individual work, reflection/evaluation of team work, pictures of basic build, customized build and video of Bot Battles streamed from Vimeo. Due 11.27

Example HERE

 

Holiday

 

Holiday
P. 3- Broadcast Media

Assignments Link

Live Studio/Announcements Continue until completed (2X)

Final Cuts with peer reviews and edits PAST DUE

Group Short “Fun” Video” – 2-4 students Due 11.27

 

Live Studio/Announcements Continue until completed (2X)

Final Cuts with peer reviews and edits PAST DUE

Group Short “Fun” Video” – 2-4 students Due 11.27

Weekly Update #12

Live Studio/Announcements Continue until completed (2X)

Final Cuts with peer reviews and edits PAST DUE

Group Short “Fun” Video” – 2-4 students Due 11.27

Holiday Holiday
P. 6 – J/YB/Pros

Assignments Link

Register Guard eEdition Link

Weekly Updates/Goal Updates #12

*** All Students: Check in with Schiff if all done with assignments

All Students: Extra Credit for Working on YB Cover Designs and submit by Cover Due Date

Rm. 212: J/YB Students: All assignments done. ePortfolios for grading

Bring HW and books to read if all done

Zinger Teams working on inserting content and images to new Zingers

Rm. 213: ECHO – PSAs should be ready to show on announcements this week; Posters finished this week. InDesign Shell completed – see Avery or Shiloh for help. More promo push

Rm. 213: Media Pros PSA #2 Due 11.26

 

Weekly Updates/Goal Updates #12

*** All Students: Check in with Schiff if all done with assignments

All Students: Extra Credit for Working on YB Cover Designs and submit by Cover Due Date

Rm. 212: J/YB Students: All assignments done. ePortfolios for grading

Bring HW and books to read if all done

Zinger Teams working on inserting content and images to new Zingers

Rm. 213: ECHO – PSAs should be ready to show on announcements this week; Posters finished this week. InDesign Shell completed – see Avery or Shiloh for help. More promo push

Rm. 213: Media Pros PSA #2 Due 11.26

 

Weekly Updates/Goal Updates #12

*** All Students: Check in with Schiff if all done with assignments

All Students: Extra Credit for Working on YB Cover Designs and submit by Cover Due Date

Rm. 212: J/YB Students: All assignments done. ePortfolios for grading

Bring HW and books to read if all done

Zinger Teams working on inserting content and images to new Zingers

Rm. 213: ECHO – PSAs should be ready to show on announcements this week; Posters finished this week. InDesign Shell completed – see Avery or Shiloh for help. More promo push

Rm. 213: Media Pros PSA #2 Due 11.26

Holiday Holiday

Weekly Update: November 18-22, 2019

Check here for updated Weekly Agendas to stay current with daily classwork and homework (rare but assigned on occasion), and assignment due dates. The agenda may flex and will be updated during the week on a per need basis. Curriculum overview is HERE.

Period Monday-11.18  Tuesday -11.19 Wednesday-11.20 Thursday -11.21 Friday -11.22
Homeroom

Homeroom Schedule – Cougar Pride Blog

Religion: Diversity Slides 1-3

Materials: Entering Sacred Spaces Handouts – Sent to student email

 Religion: Diversity Slides 4-8

Materials: Golden Rule – Sent Student email

 Religion: Diversity Slides 9-12

Video – 9:33 minutes

 Religion: Diversity Slides 9-12

Golden VS Platinum Rule: Examples and discussion

No Homeroom
P. 1 & 4 – Tech Lit

Assignments Link

Extra Credit Fun Links (with permission when assignments completed ahead)

iBook Final: Spell checked, pages balanced and uploaded to ePortfolio – Due 11.20
If Finished, extra credit: My CY iBook – 4 pages of favorites at Cal Young

Begin Choice Project – Pick from any app introduced during the term, make a project. Due 11.26

iBook Final: Spell checked, pages balanced and uploaded to ePortfolio – Due 11.20
If Finished, extra credit: My CY iBook – 4 pages of favorites at Cal Young

Begin Choice Project – Pick from any app introduced during the term, make a project. Due 11.26

iBook Final: Spell checked, pages balanced and uploaded to ePortfolio – Due 11.20
If Finished, extra credit: My CY iBook – 4 pages of favorites at Cal Young

Begin Choice Project – Pick from any app introduced during the term, make a project. Due 11.26

iBook Past Due

Choice Project Date 11.26

Any Extra Credit Due 11.26

Weekly Update #7/8

iBook Past Due

Choice Project Date 11.26

Any Extra Credit Due 11.26

P. 2 – Design Technology

Assignments Link

 

Continue with builds: Cautions – Build around battery cases and include at least 2 functional sensors to impact robot function.

Target date to complete basic build per instruction booklet is 11.18, Programmed with functioning sensors and Intelligent bricks programmed for Bot Battles: 11.22

1st & 2nd Round Alt Projects need to be approved and project summary on new ePort page. Last Chance for Grade Due 11.22

1st & 2nd Round Alt Projects need to be approved and project summary on new ePort page. Last Chance for Grade Due 11.22

Demo Programming with Mindstorm App – basic functions, loops and sensors

Continue with builds: Customize for Bot Battles: Programmed with functioning sensors and Intelligent bricks programmed for Bot Battles: 11.22

1st & 2nd Round Alt Projects need to be approved and project summary on new ePort page. Last Chance for Grade Due 11.22

Programming help with Mindstorm App – basic functions, loops and sensors

Continue with builds: Customize for Bot Battles: Programmed with functioning sensors and Intelligent bricks programmed for Bot Battles: 11.22

1st & 2nd Round Alt Projects need to be approved and project summary on new ePort page. Last Chance for Grade Due 11.22

Programming help with Mindstorm App – basic functions, loops and sensors

Continue with builds: Customize for Bot Battles: Programmed with functioning sensors and Intelligent bricks programmed for Bot Battles: 11.22

Weekly Update #11

Teams begin 1st Round of Bot Battles

ePortfolio “1 Stop” page with all Robotics work shown. Must include: Description of Project, reflection on individual work, reflection/evaluation of team work, pictures of basic build, customized build and video of Bot Battles streamed from Vimeo. Due 11.27

Example HERE

P. 3- Broadcast Media

Assignments Link

Live Studio/Announcements Continue until completed (2X)

PSA #2: Rough Cuts Due 11.15 – extended to 11.18

Filming and editing

Final Cuts with peer reviews and edits due 11.21/22

 

 

Live Studio/Announcements Continue until completed (2X)

PSA #2: Rough Cuts Due 11.15 – extended to Past Due

Filming and editing

Final Cuts with peer reviews and edits due 11.21/22

Group Short “Fun” Video” – 2-4 students Due 11.27

Live Studio/Announcements Continue until completed (2X)

Final Cuts with peer reviews and edits due 11.21/22

Group Short “Fun” Video” – 2-4 students Due 11.27

Live Studio/Announcements Continue until completed (2X)

Final Cuts with peer reviews and edits due 11.21/22

Group Short “Fun” Video” – 2-4 students Due 11.27

Weekly Update #11

Live Studio/Announcements Continue until completed (2X)

Final Cuts with peer reviews and edits due 11.21/22

Group Short “Fun” Video” – 2-4 students Due 11.27

P. 6 – J/YB/Pros

Assignments Link

Register Guard eEdition Link

All Students: Extra Credit for Working on YB Cover Designs and submit by Cover Due Date

Rm. 212: J/YB Students: InDesign “Zine” Projects Introduced. Extended Due 11.19 – 4 page “Zine” like a Zinger, with all term’s work plus supplementary pictures to complete the layout. Get Template from YB Core Leads and Schiff

Work on: 35mm Shots and Angles if not completed. Due before end of term;

Rm. 211: YB Core – Work on: Weekly Goals. 35mm Shots and Angles if not completed.

Zinger Teams working on inserting content and images to new Zingers

Rm. 213: ECHOWeekly Goals: PSAs should be ready to show on announcements this week; Posters finished this week. InDesign Shell completed – see Avery or Shiloh for help. More promo push

Rm. 213: Media Pros: Weekly Goals: PSA #2 Due 11.26

*** All Students: Check in with Schiff if all done with assignments

All Students: Extra Credit for Working on YB Cover Designs and submit by Cover Due Date

Rm. 212: J/YB Students: InDesign “Zine” Projects Introduced. Extended Due 11.19 – 4 page “Zine” like a Zinger, with all term’s work plus supplementary pictures to complete the layout. Get Template from YB Core Leads and Schiff

Work on: 35mm Shots and Angles if not completed. Due before end of term;

Rm. 211: YB Core – Work on: 35mm Shots and Angles if not completed.

Zinger Teams working on inserting content and images to new Zingers

Rm. 213: ECHO – PSAs should be ready to show on announcements this week; Posters finished this week. InDesign Shell completed – see Avery or Shiloh for help. More promo push

Rm. 213: Media Pros PSA #2 Due 11.26

*** All Students: Check in with Schiff if all done with assignments

All Students: Extra Credit for Working on YB Cover Designs and submit by Cover Due Date

Rm. 212: J/YB Students: InDesign “Zine” Projects Introduced. Extended Due 11.19 – 4 page “Zine” like a Zinger, with all term’s work plus supplementary pictures to complete the layout. Get Template from YB Core Leads and Schiff

Work on: 35mm Shots and Angles if not completed. Due before end of term;

Rm. 211: YB Core – Work on: 35mm Shots and Angles if not completed.

Zinger Teams working on inserting content and images to new Zingers

Rm. 213: ECHO – PSAs should be ready to show on announcements this week; Posters finished this week. InDesign Shell completed – see Avery or Shiloh for help. More promo push

Rm. 213: Media Pros PSA #2 Due 11.26

 

*** All Students: Check in with Schiff if all done with assignments

All Students: Extra Credit for Working on YB Cover Designs and submit by Cover Due Date

Rm. 212: J/YB Students: InDesign “Zine” Projects Introduced. Extended Due 11.19 – 4 page “Zine” like a Zinger, with all term’s work plus supplementary pictures to complete the layout. Get Template from YB Core Leads and Schiff

Work on: 35mm Shots and Angles if not completed. Due before end of term;

Rm. 211: YB Core – Work on: 35mm Shots and Angles if not completed.

Zinger Teams working on inserting content and images to new Zingers

Rm. 213: ECHO – PSAs should be ready to show on announcements this week; Posters finished this week. InDesign Shell completed – see Avery or Shiloh for help. More promo push

Rm. 213: Media Pros PSA #2 Due 11.26

Weekly Updates/Goal Updates #11

*** All Students: Check in with Schiff if all done with assignments

All Students: Extra Credit for Working on YB Cover Designs and submit by Cover Due Date

Rm. 212: J/YB Students: InDesign “Zine” Projects Introduced. Extended Due 11.19 – 4 page “Zine” like a Zinger, with all term’s work plus supplementary pictures to complete the layout. Get Template from YB Core Leads and Schiff

Work on: 35mm Shots and Angles if not completed. Due before end of term;

Rm. 211: YB Core – Work on: 35mm Shots and Angles if not completed.

Zinger Teams working on inserting content and images to new Zingers

Rm. 213: ECHO – PSAs should be ready to show on announcements this week; Posters finished this week. InDesign Shell completed – see Avery or Shiloh for help. More promo push

Rm. 213: Media Pros PSA #2 Due 11.26

 

Weekly Agenda: November 11-15, 2019

Check here for updated Weekly Agendas to stay current with daily classwork and homework (rare but assigned on occasion), and assignment due dates. The agenda may flex and will be updated during the week on a per need basis. Curriculum overview is HERE.

Period Monday – 11.11  Tuesday -11.12 Wednesday-11.13 Thursday -11.14 Friday -11.15
Homeroom

Homeroom Schedule – Cougar Pride Blog

No School  Gratitude Preso Slides 1-7
Check email for resources
Gratitude Preso Slides 8-13 Gratitude Preso Slides 14-18 No Homeroom
P. 1 & 4 – Tech Lit

Assignments Link

Extra Credit Fun Links (with permission when assignments completed ahead)

No School Book/Shell 4 Chapters, 3 section/each with specified chapter heading and choice sections Past Due

Customize Chapters and sections – write chapter intros and insert images.

Begin creating pages with images and short paragraphs/captions.

Continue collecting images for chapter pages and sections – HW – collect digital images for iBook!

Target Due Date is 11.15

Book/Shell 4 Chapters, 3 section/each with specified chapter heading and choice sections Past Due

Customize Chapters and sections – write chapter intros and insert images.

Begin creating pages with images and short paragraphs/captions.

Continue collecting images for chapter pages and sections – HW – collect digital images for iBook!

Target Due Date is 11.15

 

Book/Shell 4 Chapters, 3 section/each with specified chapter heading and choice sections Past Due

Customize Chapters and sections – write chapter intros and insert images.

Begin creating pages with images and short paragraphs/captions.

Continue collecting images for chapter pages and sections – HW – collect digital images for iBook!

Target Due Date is 11.15

Weekly Update #6

Book/Shell 4 Chapters, 3 section/each with specified chapter heading and choice sections Past Due

Customize Chapters and sections – write chapter intros and insert images.

Begin creating pages with images and short paragraphs/captions.

Continue collecting images for chapter pages and sections – HW – collect digital images for iBook!

Target Due Date is 11.15

P. 2 – Design Technology

Assignments Link

 

No School Prep for starting Robotics 11.13: Teams and requirements

Grading Updates

1St Rounders: 123d 3D Design: Boat with Oars/Alt Projects extended to 11.6 – Printed. Funnel, Mallet & Board – Past Due

2nd Rounders:123d 3D Design: Advanced Project Design Extended – Due 11.6  Screen Shots on ePort page with Project description and details. (Moving parts/snap together design)

1st & 2nd Round Alt Projects need to be approved and project summary on new ePort page. Due 11.6

Begin Robotics Builds – Intro to requirements: Look at Schiff blog and student examples.
Kits inventories, review booklets/instructions for builds.Cautions – Build around battery cases and include at least 2 functional sensors to impact robot function.Target date to complete basic build per instruction booklet is 11.17, Programmed with functioning sensors and Intelligent bricks programmed for Bot Battles: 11.22 
Kits inventories, review booklets/instructions for builds finished 11.14

Continue with builds: Cautions – Build around battery cases and include at least 2 functional sensors to impact robot function.

Target date to complete basic build per instruction booklet is 11.17, Programmed with functioning sensors and Intelligent bricks programmed for Bot Battles: 11.22

Weekly Update #10

Continue with builds: Cautions – Build around battery cases and include at least 2 functional sensors to impact robot function.

Target date to complete basic build per instruction booklet is 11.17, Programmed with functioning sensors and Intelligent bricks programmed for Bot Battles: 11.22

P. 3- Broadcast Media

Assignments Link

No School

 

Live Studio/Announcements Continue until completed (2X)

PSA#2: Scripts extended to Past Due

PSA #2: Storyboards Pat Due

PSA #2: Rough Cuts Due 11.15

Begin filming

Live Studio/Announcements Continue until completed (2X)

PSA#2: Scripts extended to Past Due

PSA #2: Storyboards Pat Due

PSA #2: Rough Cuts Due 11.15

Filming

Live Studio/Announcements Continue until completed (2X)

PSA#2: Scripts extended to Past Due

PSA #2: Storyboards Pat Due

PSA #2: Rough Cuts Due 11.15

Filming and editing

Weekly Update #10

PSA #2: Rough Cuts Due 11.15

Filming and editing

Final Cuts with peer reviews and edits due 11.22

P. 6 – J/YB/Pros

Assignments Link

Register Guard eEdition Link

No School All Students: Extra Credit for Working on YB Cover Designs and submit by Cover Due Date

Rm. 212: J/YB Students: InDesign “Zine” Projects Introduced. Due 11.15 – 4 page “Zine” like a Zinger, with all term’s work plus supplementary pictures to complete the layout. Get Template from YB Core Leads and Schiff

Zinger Teams working on inserting content and images to new Zingers

Work on: 35mm Shots and Angles if not completed. Due before end of term;

Rm. 211: YB Core – Weekly Goals. Work on: 35mm Shots and Angles if not completed.

Rm. 213: ECHOWeekly Goals; PSAs should be ready to show on announcements this week; Posters finished this week. InDesign Shell completed – see Avery or Shiloh for help. More promo push

Rm. 213: Media Pros -Weekly Goals; PSA Research on ePortfolios – Each Team Identifies a PSA Topic to begin storyboarding and filming – must be different topics. Due 11.26

All Students: Extra Credit for Working on YB Cover Designs and submit by Cover Due Date

Rm. 212: J/YB Students: InDesign “Zine” Projects Introduced. Due 11.15 – 4 page “Zine” like a Zinger, with all term’s work plus supplementary pictures to complete the layout. Get Template from YB Core Leads and Schiff

Work on: 35mm Shots and Angles if not completed. Due before end of term;

Rm. 211: YB Core – Work on: 35mm Shots and Angles if not completed.

Zinger Teams working on inserting content and images to new Zingers

Rm. 213: ECHO – PSAs should be ready to show on announcements this week; Posters finished this week. InDesign Shell completed – see Avery or Shiloh for help. More promo push

Rm. 213: Media Pros PSA Research on ePortfolios – Each Team Identifies a PSA Topic to begin storyboarding and filming – must be different topics. Due 11.26

All Students: Extra Credit for Working on YB Cover Designs and submit by Cover Due Date

Rm. 212: J/YB Students: InDesign “Zine” Projects Introduced. Due 11.15 – 4 page “Zine” like a Zinger, with all term’s work plus supplementary pictures to complete the layout. Get Template from YB Core Leads and Schiff

Work on: 35mm Shots and Angles if not completed. Due before end of term;

Rm. 211: YB Core – Work on: 35mm Shots and Angles if not completed.

Zinger Teams working on inserting content and images to new Zingers

Rm. 213: ECHO – PSAs should be ready to show on announcements this week; Posters finished this week. InDesign Shell completed – see Avery or Shiloh for help. More promo push

Rm. 213: Media Pros PSA Research on ePortfolios – Each Team Identifies a PSA Topic to begin storyboarding and filming – must be different topics. Due 11.26

Weekly Updates/Goal Updates #10

All Students: Extra Credit for Working on YB Cover Designs and submit by Cover Due Date

Rm. 212: J/YB Students: InDesign “Zine” Projects Introduced. Due 11.15 – 4 page “Zine” like a Zinger, with all term’s work plus supplementary pictures to complete the layout. Get Template from YB Core Leads and Schiff

Work on: 35mm Shots and Angles if not completed. Due before end of term;

Rm. 211: YB Core – Work on: 35mm Shots and Angles if not completed.

Zinger Teams working on inserting content and images to new Zingers

Rm. 213: ECHO – PSAs should be ready to show on announcements this week; Posters finished this week. InDesign Shell completed – see Avery or Shiloh for help. More promo push

Rm. 213: Media Pros PSA Research on ePortfolios – Each Team Identifies a PSA Topic to begin storyboarding and filming – must be different topics. Due 11.26

 

Weekly Agenda: November 4-8, 2019

Check here for updated Weekly Agendas to stay current with daily classwork and homework (rare but assigned on occasion), and assignment due dates. The agenda may flex and will be updated during the week on a per need basis. Curriculum overview is HERE.

Period Monday – 11.04  Tuesday -11.05 Wednesday-11.06 Thursday -11.07 Friday -11.08
Homeroom

Homeroom Schedule – Cougar Pride Blog

Digital Citizenship Digital Citizenship

 

TBA No School No School
P. 1 & 4 – Tech Lit

Assignments Link

Extra Credit Fun Links (with permission when assignments completed ahead)

Mop-up Photoshop Assignments: Horses MO PAST DUE, Personal MO Due Today.
Buddy Pic for Extra Credit
Intro Biopics – Picture book storytelling about “YOU”!
Tools and function with iBook AuthorPick a theme, Create Book Shell/Template 4 Chapters, 3 section/each with specified chapter heading and choice sections.
Weekly Update #6

Review Tools and function with iBook Author

Finish Book/Shell 4 Chapters, 3 section/each with specified chapter heading and choice sections.

Begin collecting images for chapter pages and sections – HW – collect digital images for iBook!

 

No School No School
P. 2 – Design Technology

Assignments Link

 

1St Rounders: 123d 3D Design: Boat with Oars/Alt Projects extended to 11.6 – Printed. Funnel, Mallet & Board – Past Due
2nd Rounders:123d 3D Design: Advanced Project Design Extended – Due 11.6  Screen Shots on ePort page with Project description and details. (Moving parts/snap together design)1st & 2nd Round Alt Projects need to be approved and project summary on new ePort page. Due 11.6
1St Rounders: 123d 3D Design: Boat with Oars/Alt Projects extended to 11.6 – Printed. Funnel, Mallet & Board – Past Due
2nd Rounders:123d 3D Design: Advanced Project Design Extended – Due 11.6  Screen Shots on ePort page with Project description and details. (Moving parts/snap together design)1st & 2nd Round Alt Projects need to be approved and project summary on new ePort page. Due 11.6
Weekly Update #9

1St Rounders: 123d 3D Design: Boat with Oars/Alt Projects extended to 11.6 – Printed. Funnel, Mallet & Board – Past Due

2nd Rounders:123d 3D Design: Advanced Project Design Extended – Due 11.6  Screen Shots on ePort page with Project description and details. (Moving parts/snap together design)

1st & 2nd Round Alt Projects need to be approved and project summary on new ePort page. Due 11.6

No School No School
P. 3- Broadcast Media

Assignments Link

Live Studio/Announcements Continue until completed (2X)

PSA#2: Scripts extended to 11.4

PSA #2: Storyboards Due 11.6

PSA #2: Rough Cuts Due 11.14

Begin filming if done early.

 

Live Studio/Announcements Continue until completed (2X)

PSA#2: Scripts extended to 11.4

PSA #2: Storyboards Due 11.6

PSA #2: Rough Cuts Due 11.14

Begin filming if done early.

Weekly Update #9

Live Studio/Announcements Continue until completed (2X)

PSA#2: Scripts extended to 11.4

PSA #2: Storyboards Due 11.6

PSA #2: Rough Cuts Due 11.14

Begin filming if done early.

No School No School
P. 6 – J/YB/Pros

Assignments Link

Register Guard eEdition Link

All Students: Extra Credit for Working on YB Cover Designs and submit by Due Date

Rm. 212: J/YB Students: InDesign “Zine” Projects Introduced. Due 11.15 – 4 page “Zine” like a Zinger, with all term’s work plus supplementary pictures to complete the layout. Get Template from YB Core Leads and Schiff

Work on: 35mm Shots and Angles if not completed. Due before end of term;

Zinger Filler x3 – Past Due – See Zinger examples on CY Website and print copies

Rm. 211: YB Core – Weekly Goals. Work on: 35mm Shots and Angles if not completed.

Zinger Filler x3 – Past Due

Rm. 213: ECHOWeekly Goals; PSAs should be ready to show on announcements this week; InDesign Shell completed – see Avery or Shiloh for help. More promo push

Rm. 213: Media Pros -Weekly Goals; PSA Final Cut Due 10.23.

!Newbie’s: Review Assignment – Check in on due date, InDesign Tutorial

All Students: Extra Credit for Working on YB Cover Designs and submit by Due Date

Rm. 212: J/YB Students: InDesign “Zine” Projects Introduced. Due 11.15 – 4 page “Zine” like a Zinger, with all term’s work plus supplementary pictures to complete the layout. Get Template from YB Core Leads and Schiff

Work on: 35mm Shots and Angles if not completed. Due before end of term;

Zinger Filler x3 – Past Due – See Zinger examples on CY Website and print copies

Rm. 211: YB Core – Weekly Goals. Work on: 35mm Shots and Angles if not completed.

Zinger Filler x3 – Past Due

Rm. 213: ECHOWeekly Goals; PSAs should be ready to show on announcements this week; InDesign Shell completed – see Avery or Shiloh for help. More promo push

Rm. 213: Media Pros -Weekly Goals; PSA Final Cut Due 10.23.

!Newbie’s: Review Assignment – Check in on due date, InDesign Tutorial

 

Weekly Goals Reflection/Update #9

All Students: Extra Credit for Working on YB Cover Designs and submit by Due Date

Rm. 212: J/YB Students: InDesign “Zine” Projects Introduced. Due 11.15 – 4 page “Zine” like a Zinger, with all term’s work plus supplementary pictures to complete the layout. Get Template from YB Core Leads and Schiff

Work on: 35mm Shots and Angles if not completed. Due before end of term;

Zinger Filler x3 – Past Due – See Zinger examples on CY Website and print copies

Rm. 211: YB Core – Weekly Goals. Work on: 35mm Shots and Angles if not completed.

Zinger Filler x3 – Past Due

Rm. 213: ECHOWeekly Goals; PSAs should be ready to show on announcements this week; InDesign Shell completed – see Avery or Shiloh for help. More promo push

Rm. 213: Media Pros -Weekly Goals; PSA Final Cut Due 10.23.

!Newbie’s: Review Assignment – Check in on due date, InDesign Tutorial

No School No School