Weekly Agenda: January 6-10, 2019

Check here for updated Weekly Agendas to stay current with daily classwork and homework (rare but assigned on occasion), and assignment due dates. The agenda may flex and will be updated during the week on a per need basis. Curriculum overview is HERE.

Period Monday-1.06  Tuesday-1.07 Wednesday-1.08 Thursday-1.09 Friday -1.10
Homeroom

Homeroom Schedule – Cougar Pride Blog

Teacher PD – No School
Review School- Wide Expectations Teacher Choice
No Homeroom
P. 1 & 4 – Tech Lit

Assignments Link

Teacher PD – No School

 

Luminaire Tutorial Link

Luminaire Work: Selecting, prepping, and subtracting line art from shells. Target 1.8 for completion.

Continue printing completed, approved, and .stl saved files.

Extra Credit: Create a second luminaire design.

Luminaire Tutorial Link

Luminaire Work: Selecting, prepping, and subtracting line art from shells. Target 1.8 for completion.

Continue printing completed, approved, and .stl saved files.

Extra Credit: Create a second luminaire design.

Introduce Databases: Concepts, and examples, Google Sheets and Google Docs set-up for 4 DB Assignments.
Assignment #1: Earthquakes DB – Due 1.14
Weekly Update #4

Database Assignment #1: Earthquakes Database Assignment Work

P. 2 – Broadcast Media

Assignments Link

 

Teacher PD – No School PSA #1 Assignment Work: 5-3-1 Topic Approved PAST DUE

Elevator Speech Extended Due 1.7 – Samples available

Script Due 1.9 – Samples available

Rough Cut Due 1.15 – on Vimeo Streamed to ePortfolio for Peer Review

Peer Review Edits List Due 1.17

Final Cut Due 1.22

PSA #1 Assignment Work: 5-3-1 Topic Approved PAST DUE

Elevator Speech Extended Due 1.7 – Samples available

Script Due 1.9 – Samples available

Rough Cut Due 1.15 – on Vimeo Streamed to ePortfolio for Peer Review

Peer Review Edits List Due 1.17

Final Cut Due 1.22

PSA #1 Assignment Work: 5-3-1 Topic Approved PAST DUE

Elevator Speech Extended Due 1.7 – Samples available

Script Due 1.9 – Samples available

Rough Cut Due 1.15 – on Vimeo Streamed to ePortfolio for Peer Review

Peer Review Edits List Due 1.17

Final Cut Due 1.22

Weekly Updates #4

PSA #1 Assignment Work: 5-3-1 Topic Approved PAST DUE

Elevator Speech Extended Due 1.7 – Samples available

Script Due 1.9 – Samples available

Rough Cut Due 1.15 – on Vimeo Streamed to ePortfolio for Peer Review

Peer Review Edits List Due 1.17

Final Cut Due 1.22

P. 3- Design Technology

Assignments Link

 

Teacher PD – No School Playgrounds Coding: Loops PAST DUE

Playgrounds Coding: Conditional Code – Due 1.10 CW and HW (Classwork as other assignments get finished, otherwise homework)

Personal Logo Assignment – 4 Personal Themed Sketches Due-1.8 for feedback and selection for #1 Design to create in Illustrator

Intro Adobe Illustrator tools: Text tools, paths, outlines, how to use web line art for designs.

Illustrator Drafts TARGET DUE – 1.10

 

Playgrounds Coding: Conditional Code – Due 1.10 CW and HW (Classwork as other assignments get finished, otherwise homework)

Personal Logo Assignment – 4 Personal Themed Sketches Due-1.8 for feedback and selection for #1 Design to create in Illustrator

Intro Adobe Illustrator tools: Text tools, paths, outlines, how to use web line art for designs.

Illustrator Drafts TARGET DUE – 1.10

 

Playgrounds Coding: Conditional Code – Due 1.10 CW and HW (Classwork as other assignments get finished, otherwise homework)

Personal Logo Assignment – 4 Personal Themed Sketches Due-1.8 for feedback and selection for #1 Design to create in Illustrator

Intro Adobe Illustrator tools: Text tools, paths, outlines, how to use web line art for designs.

Illustrator Drafts TARGET DUE – 1.10

Weekly Update#4

Playgrounds Coding: Conditional Code – Due 1.10 CW and HW (Classwork as other assignments get finished, otherwise homework)

Personal Logo Assignment – 4 Personal Themed Sketches Due-1.8 for feedback and selection for #1 Design to create in Illustrator

Intro Adobe Illustrator tools: Text tools, paths, outlines, how to use web line art for designs.

Illustrator Drafts TARGET DUE – 1.10

P. 6 – J/YB/Pros

Assignments Link

Register Guard eEdition Link

Teacher PD – No School Rm. 212J/YB: 35mm Shots and Angles Assignment – if finished with  Editorial Assignment
Editorial Assignment links and topics on Schiff Blog – Idea Map and Draft Due Extended to 1.7, Peer edited Final Copy/Packet Due 1.9

Human Interest Assignment Intro – Example Links on HI ePortfolio Page with 5-3-1 Topic Due 1.10

YB Core: Weekly goals – relating to YB work!, Check in with leads, Zinger work, Middle Middle, help students in Rm. 212, homework. 3 Week Project Work Assessment Due 1.7 – See grades! 

Clean-up ePortfolios – check on 1.10

ECHO:  Goals setting for week. Continue to work on ECHO production and/or HW – 3 Week Self Assessment – on new ePortfolio page Due 1.7

Clean-up ePortfolios – check on 1.10

Media Pros: PSA #3 – Schiff Feedback on Project work. Clean up PSAs – Redos Due 1.10,

Clean-up ePortfolios – check on 1.10

Due Today – 3 Week Self Assessment – on new ePortfolio page Due 1.7

Rm. 212 – J/YB:     35mm Shots and Angles Assignment – if finished with  Editorial Assignment
Editorial Assignment: Peer edited Final Copy/Packet Due 1.9

Human Interest Assignment Intro – Example Links on HI ePortfolio Page with 5-3-1 Topic Due 1.10

YB CoreWeekly goals – relating to YB work!, Check in with leads, Zinger work, Middle Middle, help students in Rm. 212, homework. 3 Week Project Work Assessment Due 1.7 – See grades! 

Clean-up ePortfolios – check on 1.10

ECHO:  Goals setting for week. Continue to work on ECHO production and/or HW – 3 Week Self Assessment – on new ePortfolio page Due 1.7

Clean-up ePortfolios – check on 1.10

Media Pros:   PSA #3 – Schiff Feedback on Project work. Clean up PSAs – Redos Due 1.10,

Clean-up ePortfolios – check on 1.10

Due Today – 3 Week Self Assessment – on new ePortfolio page Due 1.7

 

Rm. 212 – J/YB:     35mm Shots and Angles Assignment – if finished with  Editorial Assignment
Editorial Assignment: Peer edited Final Copy/Packet Due 1.9

Human Interest Assignment Intro – Example Links on HI ePortfolio Page with 5-3-1 Topic Due 1.10

YB CoreWeekly goals – relating to YB work!, Check in with leads, Zinger work, Middle Middle, help students in Rm. 212, homework. 3 Week Project Work Assessment Due 1.7 – See grades! 

Clean-up ePortfolios – check on 1.10

ECHO:  Goals setting for week. Continue to work on ECHO production and/or HW – 3 Week Self Assessment – on new ePortfolio page Due 1.7

Clean-up ePortfolios – check on 1.10

Media Pros:   PSA #3 – Schiff Feedback on Project work. Clean up PSAs – Redos Due 1.10,

Clean-up ePortfolios – check on 1.10

Due Today – 3 Week Self Assessment – on new ePortfolio page Due 1.7

Weekly Goals Update #4

Rm. 212 – J/YB:     35mm Shots and Angles Assignment – if finished with  Editorial Assignment

Editorial Assignment: Peer edited Final Copy/Packet PAST DUE

Human Interest Assignment Intro – Example Links on HI ePortfolio Page with 5-3-1 Topic Due 1.10

YB CoreWeekly goals – relating to YB work!, Check in with leads, Zinger work, Middle Middle, help students in Rm. 212, homework. 3 Week Project Work Assessment Due 1.7 – See grades! 

Clean-up ePortfolios – check on 1.10

ECHO:  Goals setting for week. Continue to work on ECHO production and/or HW – 3 Week Self Assessment – on new ePortfolio page Due 1.7

Clean-up ePortfolios – check on 1.10

Media Pros:   PSA #3 – Schiff Feedback on Project work. Clean up PSAs – Redos Due 1.10,

Clean-up ePortfolios – check on 1.10

Due Today – 3 Week Self Assessment – on new ePortfolio page Due 1.7

 

Leave a Reply