Agenda Week #7: October 23-27, 2017

Check here for updated Weekly Agendas to stay current with daily classwork and homework (rare but assigned on occasion), and assignment due dates. The agenda may flex and will be updated during the week on a per need basis.

Period Mon 10.23
 Tu 10.24
Wed 10.25
Th 10.26
Fri 10.27
Homeroom  Check in for week – weekly goals.

 

Expectations Review – TBA

 

No HR Reading Day – After School Jobs

 

Weekly Goal Reflection

 

1. Broadcast Media

Course Assignments Link

PSA #1 Create edit lists, apply edits to Rough Cuts, upload Final Cut to Vimeo and post on ePorts

Final Cuts due 10.24 (extended)

Video Shots assignment – Due 10.27

 

PSA #1 Create edit lists, apply edits to Rough Cuts, upload Final Cut to Vimeo and post on ePorts

Final Cuts due 10.24 (extended)

Video Shots assignment – Due 10.27

PSA #1 Final Cuts Late Grade Applied.

Video Shots assignment – Due 10.27

Video Shots assignment – Due 10.27

Begin Studio Training for those finished with Video Angles

Weekly update #7

Video Shots assignment – Due 10.27

Begin Studio Training for those finished with Video Angles

3. 3D2B

Course Assignments Link

123d Design Tutorial – Boat – Will be printed. Need to make oars to match.

Due 10.22 – screen shots, get Boats in Print Queue (extended) Begin Printing.

123d Design Nut and Bolt Tutorial Due 10.26

Boats in Print Queue (extended) Continue Printing.

123d Design Nut and Bolt Tutorial Due 10.26

Boats in Print Queue (extended) Continue Printing.

123d Design Nut and Bolt Tutorial Due 10.26

Extra Credit: Bunny Bank in Meshmixer, Fidget Spinner

Boats in Print Queue (extended) Continue Printing.

123d Design Nut and Bolt Tutorial Due 10.26

Extra Credit: Bunny Bank in Meshmixer, Fidget Spinner

Weekly Update #7

Boats in Print Queue (extended) Continue Printing.

123d Design Nut and Bolt Tutorial Due 10.26

Extra Credit: Bunny Bank in Meshmixer, Fidget Spinner

 

4. Tech Lit

Course Assignments Link

Creatures on ePorts – Due 10.23 (new page on ePorts, description, screen shots, print shot when done, reflection )

Continue Creature Printing

Intro Databases

Earthquakes DB Due 10.25

Continue Creature Printing

Work on Databases

Earthquakes DB Due 10.25

Intro $1000 Windfall DB Due 10.27

Continue Creature Printing

Work on Databases

Earthquakes DB Due 10.25

$1000 Windfall DB Due 10.27

Intro Eugene Temps DB – Due 10.27

Continue Creature Printing

Work on Databases

Earthquakes DB Due Past Due

$1000 Windfall DB Due 10.27

Eugene Temps DB – Due 10.27

Continue Creature Printing

Work on Databases

Earthquakes DB Due 10.25

$1000 Windfall DB Due 10.27

Eugene Temps DB – Due 10.27

Extra Credit – Oregon Counties DB

5. Information Design

Course Assignments Link

Company or organization approved – Past Due

Company Logo Sketches due 10.24

Company Logo Vector (AI) drafts due 10.26

 

Company Logo Sketches Past Due

Company Logo Vector (AI) drafts due 10.26

Feedback from Schiff on Vector Logos

Begin sketching collateral – use templates

 

 

 

Company Logo Vector (AI) drafts due 10.26

Feedback from Schiff on Vector Logos

Begin sketching collateral – use templates

 

Company Logo Vector (AI) drafts due 10.26

Feedback from Schiff on Vector Logos

Begin sketching collateral – use templates

Weekly Update #7

Company Logo Vector (AI) drafts Past Due

Feedback from Schiff on Vector Logos continued

Work on sketching collateral – use templates. Feedback loop w/ Schiff

 

6. J/YB/Pros

Course Assignments Link

Review writing draft work. Draft due 10.25

YB Core page assignments, photo assignments.

YB Advertising

CY Pros work on project prep and training reps.

CY Pros – Weekly goals.

YB Core – Weekly goals

Zinger shell, content selection

 

Review writing draft work. Draft due 10.25

YB Core page assignments, photo assignments.

YB Advertising

CY Pros work on project prep and training reps.

Review writing draft work. Draft due 10.25

YB Core page assignments, photo assignments.

YB Advertising

CY Pros work on project prep and training reps.

Review writing draft work. Final due 10.27

YB Core page assignments, photo assignments.

YB Advertising

CY Pros work on project prep and training reps.

Weekly update #7 and Goals Reflections

Review writing draft work. Final due 10.27

YB Core page assignments, photo assignments.

YB Advertising

CY Pros work on project prep and training reps.

 

Leave a Reply