Check here for updated Weekly Agendas to stay current with daily classwork and homework (rare but assigned on occasion), and assignment due dates. The agenda may flex and will be updated during the week on a per need basis.
Period | Mon 10.23 |
Tu 10.24 |
Wed 10.25 |
Th 10.26 |
Fri 10.27 |
Homeroom | Check in for week – weekly goals.
|
Expectations Review – TBA
|
No HR | Reading Day – After School Jobs
|
Weekly Goal Reflection
|
1. Broadcast Media | PSA #1 Create edit lists, apply edits to Rough Cuts, upload Final Cut to Vimeo and post on ePorts
Final Cuts due 10.24 (extended) Video Shots assignment – Due 10.27
|
PSA #1 Create edit lists, apply edits to Rough Cuts, upload Final Cut to Vimeo and post on ePorts
Final Cuts due 10.24 (extended) Video Shots assignment – Due 10.27 |
PSA #1 Final Cuts Late Grade Applied.
Video Shots assignment – Due 10.27 |
Video Shots assignment – Due 10.27
Begin Studio Training for those finished with Video Angles |
Weekly update #7
Video Shots assignment – Due 10.27 Begin Studio Training for those finished with Video Angles |
3. 3D2B | 123d Design Tutorial – Boat – Will be printed. Need to make oars to match.
Due 10.22 – screen shots, get Boats in Print Queue (extended) Begin Printing. 123d Design Nut and Bolt Tutorial Due 10.26 |
Boats in Print Queue (extended) Continue Printing.
123d Design Nut and Bolt Tutorial Due 10.26 |
Boats in Print Queue (extended) Continue Printing.
123d Design Nut and Bolt Tutorial Due 10.26 Extra Credit: Bunny Bank in Meshmixer, Fidget Spinner |
Boats in Print Queue (extended) Continue Printing.
123d Design Nut and Bolt Tutorial Due 10.26 Extra Credit: Bunny Bank in Meshmixer, Fidget Spinner |
Weekly Update #7
Boats in Print Queue (extended) Continue Printing. 123d Design Nut and Bolt Tutorial Due 10.26 Extra Credit: Bunny Bank in Meshmixer, Fidget Spinner
|
4. Tech Lit | Creatures on ePorts – Due 10.23 (new page on ePorts, description, screen shots, print shot when done, reflection )
Continue Creature Printing Intro Databases Earthquakes DB Due 10.25 |
Continue Creature Printing
Work on Databases Earthquakes DB Due 10.25 Intro $1000 Windfall DB Due 10.27 |
Continue Creature Printing
Work on Databases Earthquakes DB Due 10.25 $1000 Windfall DB Due 10.27 Intro Eugene Temps DB – Due 10.27 |
Continue Creature Printing
Work on Databases Earthquakes DB Due Past Due $1000 Windfall DB Due 10.27 Eugene Temps DB – Due 10.27 |
Continue Creature Printing
Work on Databases Earthquakes DB Due 10.25 $1000 Windfall DB Due 10.27 Eugene Temps DB – Due 10.27 Extra Credit – Oregon Counties DB |
5. Information Design | Company or organization approved – Past Due
Company Logo Sketches due 10.24 Company Logo Vector (AI) drafts due 10.26
|
Company Logo Sketches Past Due
Company Logo Vector (AI) drafts due 10.26 Feedback from Schiff on Vector Logos Begin sketching collateral – use templates
|
Company Logo Vector (AI) drafts due 10.26
Feedback from Schiff on Vector Logos Begin sketching collateral – use templates
|
Company Logo Vector (AI) drafts due 10.26
Feedback from Schiff on Vector Logos Begin sketching collateral – use templates |
Weekly Update #7
Company Logo Vector (AI) drafts Past Due Feedback from Schiff on Vector Logos continued Work on sketching collateral – use templates. Feedback loop w/ Schiff
|
6. J/YB/Pros | Review writing draft work. Draft due 10.25
YB Core page assignments, photo assignments. YB Advertising CY Pros work on project prep and training reps. CY Pros – Weekly goals. YB Core – Weekly goals Zinger shell, content selection
|
Review writing draft work. Draft due 10.25
YB Core page assignments, photo assignments. YB Advertising CY Pros work on project prep and training reps. |
Review writing draft work. Draft due 10.25
YB Core page assignments, photo assignments. YB Advertising CY Pros work on project prep and training reps. |
Review writing draft work. Final due 10.27
YB Core page assignments, photo assignments. YB Advertising CY Pros work on project prep and training reps. |
Weekly update #7 and Goals Reflections
Review writing draft work. Final due 10.27 YB Core page assignments, photo assignments. YB Advertising CY Pros work on project prep and training reps. |