Agenda Week 8: October 30-November 3, 2017

Check here for updated Weekly Agendas to stay current with daily classwork and homework (rare but assigned on occasion), and assignment due dates. The agenda may flex and will be updated during the week on a per need basis.

Period Mon 10.30
 Tu 10.31
Wed 11.01
Th 11.02
Fri 11.03
Homeroom  Check in for week – weekly goals.

 

Expectations Review – TBA

 

No HR Reading Day – Should Students Step in to Stop Bullying

 

Weekly Goal Reflection

 

1. Broadcast Media

Course Assignments Link

Video Shots assignment – Due 10.31 (Extended)

Begin Studio Training for those finished with Video Angles

 

Video Shots assignment – Due 10.31 (Extended)

Studio Training for those finished with Video Angles

Video Shots assignment – Past Due

Studio Training

Brainstorm PSA#2 topics – need to be approved by 11.03

Studio Training

Brainstorm PSA#2 topics – need to be approved by 11.03

Weekly update #8

Studio Training

Brainstorm PSA#2 topics – need to be approved by 11.03

3. 3D2B

Course Assignments Link

Boats all printed, on ePorts, complete assignment Due 10.30 – extended.

123d Design Nut and Bolt Tutorial Due 10.31 – extended. On ePorts no later than 11.1

Simple Project/Simple Solution (SPSS) Design/prototype IDEA approved 10.31

 

123d Design Nut and Bolt Tutorial Due 10.31 – extended. On ePorts no later than 11.1

Simple Project/Simple Solution (SPSS) Design/prototype IDEA approved 10.31

123d Design Nut and Bolt Tutorial Due 10.31 – extended. On ePorts no later than 11.1

Begin design work on SPSS assignment

Continue design work on SPSS assignment

First review of SPSS Due 11.8

Weekly Update #8

Continue design work on SPSS assignment

First review of SPSS Due 11.8

4. Tech Lit

Course Assignments Link

Work on Databases

Earthquakes DB Due 10.25

$1000 Windfall DB Due 10.27

Eugene Temps DB – Due 10.27

Extra Credit – Oregon Counties DB

Check on DB completion. Extend through today if needed.

Students who are finished work on Oregon Counties DB extra credit.

Intro to Photoshop

Demo tools and sample work for Assignment #1 – Horses Makeover. Due 11.8

Personal Makeover Due 11.14

Photoshop work for completing Assignment #1 – Horses Makeover. Due 11.8

Personal Makeover Due 11.14

Photoshop work for completing Assignment #1 – Horses Makeover. Due 11.8

Personal Makeover Due 11.14

5. Information Design

Course Assignments Link

Company Logo Vector (AI) drafts Past Due

Collateral Sketches Due 10.31
Use templates – Feedback loop w/ Schiff

 

 

Collateral Sketches Due 10.31
Use templates – Feedback loop w/ Schiff

Work on Collateral designs illustrator. Collateral in Illustrator – Due 11.3

 

 

 

Work on Collateral designs illustrator. Collateral in Illustrator – Due 11.3
 
Work on Collateral designs illustrator. Collateral in Illustrator – Due 11.3 Weekly Update #8

Work on Collateral designs illustrator. Collateral in Illustrator – Due 11.3
 

6. J/YB/Pros

Course Assignments Link

3 “Fun” Zinger pieces – Due 11.3

YB Core page assignments, photo assignments.

YB Advertising

CY Pros work on project prep and training reps.

CY Pros – Weekly goals.

YB Core – Weekly goals

Zinger shell, content selection

 

3 “Fun” Zinger pieces – Due 11.3

YB Core page assignments, photo assignments.

YB Advertising

CY Pros work on project prep and training reps.

CY Pros – Weekly goals.

YB Core – Weekly goals

Zinger shell, content selection

3 “Fun” Zinger pieces – Due 11.3

YB Core page assignments, photo assignments.

YB Advertising

CY Pros work on project prep and training reps.

CY Pros – Weekly goals.

YB Core – Weekly goals

Zinger shell, content selection

3 “Fun” Zinger pieces – Due 11.3

YB Core page assignments, photo assignments.

YB Advertising

CY Pros work on project prep and training reps.

CY Pros – Weekly goals.

YB Core – Weekly goals

Zinger shell, content selection

3 “Fun” Zinger pieces – Due 11.3

YB Core page assignments, photo assignments.

YB Advertising

CY Pros work on project prep and training reps.

CY Pros – Weekly goals.

YB Core – Weekly goals

Zinger shell, content selection

 

Agenda Week #7: October 23-27, 2017

Check here for updated Weekly Agendas to stay current with daily classwork and homework (rare but assigned on occasion), and assignment due dates. The agenda may flex and will be updated during the week on a per need basis.

Period Mon 10.23
 Tu 10.24
Wed 10.25
Th 10.26
Fri 10.27
Homeroom  Check in for week – weekly goals.

 

Expectations Review – TBA

 

No HR Reading Day – After School Jobs

 

Weekly Goal Reflection

 

1. Broadcast Media

Course Assignments Link

PSA #1 Create edit lists, apply edits to Rough Cuts, upload Final Cut to Vimeo and post on ePorts

Final Cuts due 10.24 (extended)

Video Shots assignment – Due 10.27

 

PSA #1 Create edit lists, apply edits to Rough Cuts, upload Final Cut to Vimeo and post on ePorts

Final Cuts due 10.24 (extended)

Video Shots assignment – Due 10.27

PSA #1 Final Cuts Late Grade Applied.

Video Shots assignment – Due 10.27

Video Shots assignment – Due 10.27

Begin Studio Training for those finished with Video Angles

Weekly update #7

Video Shots assignment – Due 10.27

Begin Studio Training for those finished with Video Angles

3. 3D2B

Course Assignments Link

123d Design Tutorial – Boat – Will be printed. Need to make oars to match.

Due 10.22 – screen shots, get Boats in Print Queue (extended) Begin Printing.

123d Design Nut and Bolt Tutorial Due 10.26

Boats in Print Queue (extended) Continue Printing.

123d Design Nut and Bolt Tutorial Due 10.26

Boats in Print Queue (extended) Continue Printing.

123d Design Nut and Bolt Tutorial Due 10.26

Extra Credit: Bunny Bank in Meshmixer, Fidget Spinner

Boats in Print Queue (extended) Continue Printing.

123d Design Nut and Bolt Tutorial Due 10.26

Extra Credit: Bunny Bank in Meshmixer, Fidget Spinner

Weekly Update #7

Boats in Print Queue (extended) Continue Printing.

123d Design Nut and Bolt Tutorial Due 10.26

Extra Credit: Bunny Bank in Meshmixer, Fidget Spinner

 

4. Tech Lit

Course Assignments Link

Creatures on ePorts – Due 10.23 (new page on ePorts, description, screen shots, print shot when done, reflection )

Continue Creature Printing

Intro Databases

Earthquakes DB Due 10.25

Continue Creature Printing

Work on Databases

Earthquakes DB Due 10.25

Intro $1000 Windfall DB Due 10.27

Continue Creature Printing

Work on Databases

Earthquakes DB Due 10.25

$1000 Windfall DB Due 10.27

Intro Eugene Temps DB – Due 10.27

Continue Creature Printing

Work on Databases

Earthquakes DB Due Past Due

$1000 Windfall DB Due 10.27

Eugene Temps DB – Due 10.27

Continue Creature Printing

Work on Databases

Earthquakes DB Due 10.25

$1000 Windfall DB Due 10.27

Eugene Temps DB – Due 10.27

Extra Credit – Oregon Counties DB

5. Information Design

Course Assignments Link

Company or organization approved – Past Due

Company Logo Sketches due 10.24

Company Logo Vector (AI) drafts due 10.26

 

Company Logo Sketches Past Due

Company Logo Vector (AI) drafts due 10.26

Feedback from Schiff on Vector Logos

Begin sketching collateral – use templates

 

 

 

Company Logo Vector (AI) drafts due 10.26

Feedback from Schiff on Vector Logos

Begin sketching collateral – use templates

 

Company Logo Vector (AI) drafts due 10.26

Feedback from Schiff on Vector Logos

Begin sketching collateral – use templates

Weekly Update #7

Company Logo Vector (AI) drafts Past Due

Feedback from Schiff on Vector Logos continued

Work on sketching collateral – use templates. Feedback loop w/ Schiff

 

6. J/YB/Pros

Course Assignments Link

Review writing draft work. Draft due 10.25

YB Core page assignments, photo assignments.

YB Advertising

CY Pros work on project prep and training reps.

CY Pros – Weekly goals.

YB Core – Weekly goals

Zinger shell, content selection

 

Review writing draft work. Draft due 10.25

YB Core page assignments, photo assignments.

YB Advertising

CY Pros work on project prep and training reps.

Review writing draft work. Draft due 10.25

YB Core page assignments, photo assignments.

YB Advertising

CY Pros work on project prep and training reps.

Review writing draft work. Final due 10.27

YB Core page assignments, photo assignments.

YB Advertising

CY Pros work on project prep and training reps.

Weekly update #7 and Goals Reflections

Review writing draft work. Final due 10.27

YB Core page assignments, photo assignments.

YB Advertising

CY Pros work on project prep and training reps.

 

Agenda Week #6: October 16-20, 2017

Check here for updated Weekly Agendas to stay current with daily classwork and homework (rare but assigned on occasion), and assignment due dates. The agenda may flex and will be updated during the week on a per need basis.

Period Mon 10.16
 Tu 10.17
Wed 10.18
Th 10.19
Fri 10.20
Homeroom  Check in for week – weekly goals.

 

Expectations Review – CY Food & Drink Policy

 

Assigned Theme Reading Day/Words

 

Weekly Goal Reflection

 

1. Broadcast Media

Course Assignments Link

PSA #1 Research for facts and images – have images checked.

PSA #1 Production for Rough Cut

Peer evaluate ready Roughs

Rough Cut Target Due date 10.17

PSA #1 Research for facts and images – have images checked.

PSA #1 Production for Rough Cut

Peer evaluate ready Roughs

Rough Cut Target Due date 10.17

PSA #1 Create edit lists, apply edits to Rough Cuts, upload Final Cut to Vimeo and post on ePorts

Final Cuts due 10.20

Those finished begin Video Shots assignment

PSA #1 Create edit lists, apply edits to Rough Cuts, upload Final Cut to Vimeo and post on ePorts

Final Cuts due 10.20

Those finished begin Video Shots assignment

Weekly update #6

Final Cuts due 10.20

Those finished begin Video Shots assignment

3. 3D2B

Course Assignments Link

Primitves Hybrid
Finish  Past Due. Print Hybrid if desired.123d Design Tutorial – Mallet and Board – Due 10.17
Print Hybrid if desired.

123d Design Tutorial – Mallet and Board – Due 10.17

Print Hybrid if desired.

123d Design Tutorial – Boat – Will be printed. Need to make oars to match.

Due 10.20 – screen shots, get in Print Queue

123d Design Tutorial – Boat – Will be printed. Need to make oars to match.

Due 10.20 – screen shots, get in Print Queue

Weekly Update

123d Design Tutorial – Boat – Will be printed. Need to make oars to match.

Due 10.20 – screen shots, get in Print Queue

 

4. Tech Lit

Course Assignments Link

Continue 123d Sculpt+ discovery, “skeleton”, and “bake” modes.

Creatures Due 10.20 (screen shots on ePorts)

Review /demo export to email, pick up from email to files 1, make STL for printing.

Begin Print approval

Continue 123d Sculpt+ Creature work.

Creatures Due 10.20 (screen shots on ePorts)

Demo how to take screen shots of print approved creatures

Begin Printing

Continue 123d Sculpt+ Creature work.

Creatures Due 10.20 (screen shots on ePorts)

Begin Printing

Continue 123d Sculpt+ Creature work.

Creatures Due 10.20 (screen shots on ePorts)

Begin Printing

Extra Credit Creature if done or waiting for print.

Weekly Updates

Creatures Due 10.20 (screen shots on ePorts)

Begin Printing

Extra Credit Creature if done or waiting for print.

5. Information Design

Course Assignments Link

Company, organization ideas.

Company or organization approved – Past Due

Begin Company Questions from Schiff blog when approved. Due 10.17

 

Company, organization ideas.

Finish Company Questions from Schiff blog when approved. Due 10.17

 

Begin company logo sketches – Due 10.20 Scanned and on ePorts as PDFs

 

Begin company logo sketches – Due 10.20 Scanned and on ePorts as PDFs

Begin creating logo in Illustrator if sketches approved .

Weekly Update

Begin company logo sketches – Due 10.20 Scanned and on ePorts as PDFs

Begin creating logo in Illustrator if sketches approved .

 

6. J/YB/Pros

Course Assignments Link

Human Interest paper work. Due 10.17

CY Pros – Weekly goals.

YB Core – Weekly goals

Zinger shell, content selection

 

Human Interest paper work. Due 10.17

YB Core on HI and Advertising

CY Pros work on project prep and training reps.

Review writing – Movie, book, event, series, Video game, etc. Topic due 10.19

YB Core ladder review. Advertising

CY Pros work on project prep and training reps.

Review writing – Movie, book, event, series, Video game, etc. Topic due 10.19. Begin daft when approved.

YB Core ladder finalization. Advertising

CY Pros work on project prep and training reps.

Weekly update

Review writing draft work. Draft due 10.25

YB Core page assignments, photo assignments.

YB Advertising

CY Pros work on project prep and training reps.

 

Agenda Week #5: October 9th – October 13th

Check here for updated Weekly Agendas to stay current with daily classwork and homework (rare but assigned on occasion), and assignment due dates. The agenda may flex and will be updated during the week on a per need basis.

Period Mon 10.9
 Tu 10.10
Wed 10.11
Th 10.12
Fri 10.13
Homeroom  Check in for week – weekly goals.

 

Midterm Check-in

 

Goal Reflection Grading Day

 

State-wide In-service

 

1. Broadcast Media

Course Assignments Link

PSA #1 Research for facts and images – have images checked.

PSA #1 Production for Rough Cut

Rough Cut Target Due date 10.17

PSA #1 Research for facts and images – have images checked.

PSA #1 Production for Rough Cut

Rough Cut Target Due date 10.17

PSA #1 Research for facts and images – have images checked.

PSA #1 Production for Rough Cut

Rough Cut Target Due date 10.17

Grading Day Statewide In-Service
3. 3D2B

Course Assignments Link

Primitves Hybrid
Finish  Due today.

Print Hybrid if desired.

123d Design Tutorial – Mallet and Board – Due 10.16

Print Hybrid if desired.

123d Design Tutorial – Mallet and Board – Due 10.16

Print Hybrid if desired.

123d Design Tutorial – Mallet and Board – Due 10.16

Grading Day
 
State-Wide In-Service

 

4. Tech Lit

Course Assignments Link

Begin 123d Sculpt+: 3D Design environment. Tools and tips.

Life  like creature examples.

 

Continue 123d Sculpt+ discovery, “skeleton”, and “bake” modes. Continue 123d Sculpt+ discovery, “skeleton”, and “bake” modes. Grading Day State-wide In-Service
5. Information Design

Course Assignments Link

Company, organization ideas.

Company or organization approved by 10.12

Begin Company Questions from Schiff blog when approved.

 

Company, organization ideas.

Company or organization approved by 10.12

Begin Company Questions from Schiff blog when approved.

 

Company, organization ideas.

Company or organization approved by 10.12

Begin Company Questions from Schiff blog when approved.

Grading Day State-wide In-service
 
6. J/YB/Pros

Course Assignments Link

Human Interest paper work. Due 10.16

CY Pros debrief with HR and mentors

 

Human Interest paper work. Due 10.16

YB Core on HI and Advertising

CY Pros work on project prep and training reps.

Human Interest paper work. Due 10.16

YB Core on HI and Advertising

CY Pros work on project prep and training reps.

Grading Day State-wide In-service

 

Agenda Week #4: Oct. 2nd-6th, 2017

Check here for updated Weekly Agendas to stay current with daily classwork and homework (rare but assigned on occasion), and assignment due dates. The agenda may flex and will be updated during the week on a per need basis.

Period Mon 10.2
 Tu 10.3
Wed 10.4
Th 10.5
Fri 10.6
Homeroom  Check in for week – weekly goals.

Bus Safety Video

Weekly Goals Update TBA Reading Day Article – Vocab Words

 

Goal Reflections
1. Broadcast Media

Course Assignments Link

PSA #1 Elevator Speech – Past Due

PSA #1 Research for facts and images

Script Due 10.4

Images and Facts no later than 10.6

PSA #1 Script work. Due 10.4

Intro iMovie Tools/review

Research facts and collect images

Begin Producing PSA #1 if script approved.

PSA #1 Script Due.

Continue research for facts nd collect images. Due no later than 10.6

Begin PSA #1 production in iMovie.

PSA #1 Research for facts and images – have images checked.

PSA #1 Production for Rough Cut

Rough Cut Target Due date 10.17

Weekly Update #4

PSA #1 Research for facts and images – have images DUE

PSA #1 Production for Rough Cut

Rough Cut Target Due date 10.17

3. 3D2B

Course Assignments Link

Final 3D Print Creatures in Print Queue

Upload completed Assignment per specs to ePortfolio

Sketchup work – 2 assignment exercises: Chair and Bowl

Bowl Due – 9.26

Chair Due

 Sketchup work – 2 assignment exercises: Chair and Bowl

Bowl Due – 9.26

Chair Due – 9.27

Extra Credit – Vase – See my blog for assignments

 Sketchup work – 2 assignment exercises: Chair and Bowl

Chair Due – 9.27+

Extra Credit – Vase – See my blog for assignments

Intro 123d Design App – tools, and applications.

Intro Hybrid Assignment – Primitives and Kits t create a unique object. Due – 10.3

 

Hybrid Assignment  Work – Primitives and Kits t create a unique object. Due – 10.3

 

4. Tech Lit

Course Assignments Link

3 EasyBib citation in place – Due 9.22+

Intro Sample Report Formatting – handout for binder

Continue topic research and note taking in Google Docs.

 

Continue topic research and note taking in Google Docs.

Target notes Due – 9.27

Begin writing draft of research paper in Google Docs – Target draft Due – 9.29 Continue writing draft of research paper in Google Docs – Target draft Due – 9.29 Continue writing draft of research paper in Google Docs – Target draft Due – 9.29

Begin Peer Editing

5. Information Design

Course Assignments Link

Name Branding Part 3 – Paint Tree Logo exercise Due 9.25+

Intro Name Branding Part 2 – Basic Logo Design

 

Intro Name Branding Part 2 – Basic Logo Design

Target Due – 9.29

 

Name Branding Part 2 – Basic Logo Design work

Target Due – 9.29

Name Branding Part 2 – Basic Logo Design work

Target Due – 9.29

Name Branding Part 2 – Basic Logo Design work

Target Due – 9.29

ePortfolio/Assignment check

 

6. J/YB/Pros

Course Assignments Link

Editorial Assignment – Drafts due 9.22… extended to 9.26 Editorial Assignment work  – Drafts due 9.26

YB Work on ladder

Pros meet with Kevin on Wednesday

Editorial Assignment work  – Final paper  due 9.29

YB Group work per assigned tasks

CY Pros work per assigned tasks

Editorial Assignment work  – Final paper  due 9.29

YB Group work per assigned tasks

CY Pros work per assigned tasks

Editorial Assignment work  – Final copy –  Due Today

YB Group work per assigned tasks

CY Pros work per assigned tasks